1 / 53

UCSF Medical Center at Mission Bay Proposed Fourth Street Public Plaza Mission Bay CAC February 9, 2012

UCSF Medical Center at Mission Bay Proposed Fourth Street Public Plaza Mission Bay CAC February 9, 2012. Agenda. Overview: UCSF Medical Center at Mission Bay Proposal: Fourth Street Public Plaza Plaza Area Concept Proposed Design Multi-Use Promenade Amphitheatre Central Plaza Grove

inge
Télécharger la présentation

UCSF Medical Center at Mission Bay Proposed Fourth Street Public Plaza Mission Bay CAC February 9, 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UCSF Medical Center at Mission BayProposed Fourth Street Public Plaza Mission Bay CACFebruary 9, 2012

  2. Agenda • Overview: UCSF Medical Center at Mission Bay • Proposal: Fourth Street Public Plaza • Plaza Area Concept • Proposed Design • Multi-Use Promenade • Amphitheatre • Central Plaza • Grove • Bench Walk • Circulation • Milestones and Public Input

  3. The Plan for Mission Bay – 2014 Integrated Children’s, Women’s Specialty and Cancer Hospitals • Children's Hospital – 183 beds • urgent/emergency care and pediatric primary and specialty outpatient care • Women's Specialty Hospital – 36 beds • cancer care, specialty surgery, a 36-bed birth center and select women's ambulatory services • Cancer Hospital – 70 beds • first step to full cancer services at MB • Outpatient Building and Helipad • Energy Center (central plant) • Parking

  4. Hospital Energy Center Outpatient Children’s (183 beds) Women’s (36 beds) Cancer (70 beds) Children’s & Women’s (Future Cancer 2020) Helipad UCSF Research Campus MARIPOSA STREET FOURTH STREET

  5. UCSF Benioff Children’s Hospital

  6. Third Street Plaza

  7. Outpatient Building and Helipad

  8. Proposal: Fourth Street Public Plaza Opportunity to create a warm and welcoming open space for all community members – including patients, visitors, staff Public realm – pedestrians, bike path, landscaping Farmer’s markets; concerts; urban experience Accessible by fire/emergency vehicles and can be easily opened in an emergency that requires through traffic After extensive consultation the City Family is supportive of proposed design

  9. Mission Bay Context Plan 4th Street Public Plaza

  10. Constituents’ Goals

  11. Proposed Design

  12. Concept Plan – Phase 1

  13. Concept Plan – Phase 2

  14. Multi-use Promenade

  15. Multi-use Promenade – From North Promenade images

  16. Multi-use Promenade – View South

  17. Multi-use Promenade – Plaza

  18. Multi-use Promenade – From South

  19. Promenade Access

  20. Fourth Street Public Plaza

  21. Amphitheater

  22. Amphitheater – From North Drop-off

  23. Amphitheater – From Central Plaza

  24. Amphitheater – From Central Plaza

  25. Amphitheater – From Top

  26. Amphitheater – From Bridge

  27. Central Plaza

  28. Front Porch Grove

  29. Grove – From South Drop-Off

  30. Grove – From South

  31. Bench Walk

  32. Bench Walk – Pedestrian

  33. Circulation

  34. Primary Movement Corridors

  35. Existing Bicycle Network & Currently Proposed Changes to Mission Bay Plan Class I Bicycle Lane: Separate ROW Class II Bicycle Lane: Striped lane Class III Bicycle Lane: Shared with arrow striping

  36. Traffic Analysis of Proposed Change • The closure of Fourth Street to vehicular through traffic was analyzed as a project alternative in UCSF’s 2008 Medical Center at Mission Bay EIR • Traffic improvement measures have been identified to address effects if Fourth Street were closed to vehicular through traffic • Implementation of these measures would allow intersections to operate at acceptable levels of service • UCSF would fund the implementation of these measures

  37. Proposed Traffic Improvement Measures Restriping in Existing ROW Restriping in Existing ROW Street Widening, Turn Lanes and Median Energy Center Turnout Fourth Street Public Plaza New Traffic Signal New Right Turn Lane Changes to Optimize Circulation Changes for 4th Street Public Plaza

  38. Milestones and Public Input

  39. Anticipated Project Milestones Continued Nov 2011: Design competition for landscape architect Feb 2012: Draft EIR Published Mar 2012: Draft EIR Public Hearing Mar 2012: Plaza Design Complete Summer 2012: Final EIR Summer 2012: UC Certification of EIR, Approval of Budget & Design Jul or Sep 2012: SF Board of Supervisors

  40. Anticipated Project Milestones (continued) Public input opportunities follow Sept 2012: Underground utility construction begins Nov 2012: Plaza construction documents complete Mar 2013: Approval and Permits from State Fire Marshal and SF DPW May 2013: Plaza construction begins 2015: UCSF Medical Center at Mission Bay opens

  41. Opportunities for Public Input Past Opportunities 2008 – 2009 Community design meetings Jun 1, 2011 UCSF Mission Bay CAG Action Team Jul 12, 2011 Dogpatch Neighborhood Association Sep 12, 2011 South Beach Mission Bay Rincon Hill Neighborhood Association Oct 15, 2011 Potrero Hill Festival information table Oct 22, 2011 Potrero Hill History Night information table Nov 9, 2011 Dogpatch Neighborhood Association

  42. Opportunities for Public Input Anticipated Opportunities 2012 January 23 UCSF Community Meeting February 9 Mission Bay Citizens Advisory Committee March 12 South Beach/Rincon/Mission Bay Neighborhood Assn March 13 Dogpatch Neighborhood Association Feb–Mar Draft EIR Public Comment Period March Draft EIR Public Hearing March DPW Director Hearing on Major Encroachment Permit Summer UC Certification of EIR, Approval of Budget and Design Summer Successor Agency Oversight Board Meeting on Public Plaza Design Summer (Potential) MTA Board Meeting on Fourth Street Summer (Potential) Planning Commission Meeting on General Plan Referral Summer SF Board of Supervisors

  43. END OF PRESENTATION

  44. Circulation – Phase 1

  45. Circulation – Phase 2

  46. Promenade Access Phase 1

  47. Promenade Access Phase 2

More Related