1 / 4

Update on LS1 Activities

Update on LS1 Activities. W.Baldini , N. Bondar , O.Maev,B . Schmidt . LS1 Muon Meeting June-12th 2014 . Ongoing Activities . Grounding Improvement: DONE Fixing problematic chambers in M2-5 (broken and noisy FEBs): ongoing, it will take ~3 weeks

inoke
Télécharger la présentation

Update on LS1 Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on LS1 Activities W.Baldini, N. Bondar, O.Maev,B. Schmidt LS1 Muon Meeting June-12th 2014

  2. Ongoing Activities • Grounding Improvement: DONE • Fixing problematic chambers in M2-5 (broken and noisy FEBs): ongoing, it will take ~3 weeks • Next week we plan to move to M1 back sides (A and possibly C) since there should be all the right conditions (nacelle available, CALO closed) • Starting from the beginning of July there will be the maintenance of the Marathon (replacement of the water-cooling connectors): • During the maintenance the corresponding detector side will be OFF • Right now we have problems with system configuration, probably due to ELMBs. Davide/Beat are investigating

  3. Ongoing Activities • Connectivity test (C side) stopped due to the ELMBs problem, hopefully it will be resumed soon… • HV: • Re-conditioning of M4R4 and problematic chambers: DONE • HV Connectors (RDB-racks end) improving: DONE • Check mapping of PNPI system for A-C side and re-connect the CMBs: Just started • Migration to CCPCs in progress, problem with USB-RS232 driver (WIN2008)

  4. Ongoing Activities • Next commissioning week: June 23-27, we will try to connect and turn on PNPI-HV-Chambers (at least one side), so far we left the chambers unplugged. • For more details, as usual you can refer to the e-logbook: http://lblogbook.cern.ch/MUON/

More Related