Results Based Management: Logical Framework Matrix (LFM)

DESCRIPTION

Results Based Management: Logical Framework Matrix (LFM). Abeer Shakweer, Ph.D., Planning and Monitoring Manager Science and Technology Development Fund. December 30 th , 2009. LFM is a

1 / 8

Download Presentation
Télécharger la présentation

Results Based Management: Logical Framework Matrix (LFM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results Based Management: Logical Framework Matrix (LFM) Abeer Shakweer, Ph.D., Planning and Monitoring Manager Science and Technology Development Fund December 30th, 2009

  2. LFM is a Result Based Management (RBM) tool for systematic planning, implementation , monitoring, and evaluation of projects

  3. LFM

  4. Results oriented- not activity driven logically sets objectives and their causal relationships shows whether objectives have been achieved: Indicators (for M&E) describes external factors that influence the project’s success: assumptions and risks Features of LFM

  5. Components of LFM 3.Basic Steps and ElementsPlanning PhaseProject Planning Matrix (PPM) • Vertical Logic • Identifies what the project intends to do and achieve • Clarifies the causal relationship • Specifies important assumptions and risks GOAL Objectives OUTPUTS ACTIVITIES • Horizontal Logic • Identifies the source and means by which indicators will be verified • Specifies indicators to measure progress Aims measured by indicators through information collected and presented in specified means of verification

  6. Sustainable Coastal Development of Lake Manzala

  7. WHY the project is carried out (development objective, immediate objectives) WHAT the project is supposed to produce (outputs) HOW the project is going to achieve the outputs (activities) HOW the success of the project can be measured (indicators) WHERE the data can be found (means of verification) WHICH external factors influence the project (assumptions) LFM is a “Summary” of the Project