PIMS prototype construction experience

Details of the construction procedure elaborated by CERN for the PIMS prototype. PIMS prototype construction experience. Construction sequence for standard rings type 3. Table 1: Construction sequence for standard rings type 3 (1/2). Rough machining: oversize + 1 mm. + 2 mm. + 2 mm. - 2 mm.

isla
Télécharger la présentation

PIMS prototype construction experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Details of the construction procedure elaborated by CERN for the PIMS prototype PIMS prototype construction experience G. Favre EN/MME

  2. Construction sequence for standard rings type 3 G. Favre EN/MME

  3. Table 1: Construction sequence for standard rings type 3 (1/2) G. Favre EN/MME

  4. G. Favre EN/MME

  5. G. Favre EN/MME

  6. G. Favre EN/MME

  7. Rough machining: oversize + 1 mm + 2 mm + 2 mm - 2 mm G. Favre EN/MME

  8. G. Favre EN/MME

  9. Table 1: Construction sequence for standard rings type 3 (2/2) G. Favre EN/MME

  10. G. Favre EN/MME

  11. Construction sequence for pick-up rings G. Favre EN/MME

  12. Table 2: Construction sequence for pick-up rings (1/2) G. Favre EN/MME

  13. G. Favre EN/MME

  14. G. Favre EN/MME

  15. G. Favre EN/MME

  16. G. Favre EN/MME

  17. G. Favre EN/MME

  18. G. Favre EN/MME

  19. Table 2: Construction sequence for pick-up rings (2/2) G. Favre EN/MME

  20. G. Favre EN/MME

  21. G. Favre EN/MME

  22. Construction sequence of central ring type 4 G. Favre EN/MME

  23. Table 3: Construction sequence of central ring type 4 G. Favre EN/MME

  24. G. Favre EN/MME

  25. G. Favre EN/MME

  26. G. Favre EN/MME

  27. G. Favre EN/MME

  28. G. Favre EN/MME

  29. G. Favre EN/MME

  30. G. Favre EN/MME

  31. Table 3: Construction sequence of central ring type 4 G. Favre EN/MME

  32. G. Favre EN/MME

  33. G. Favre EN/MME

  34. G. Favre EN/MME

  35. G. Favre EN/MME

  36. G. Favre EN/MME

  37. Construction sequence of central disc type 1, type 3 and & disc type 3 G. Favre EN/MME

  38. Table 4: Construction sequence of central disc type 1, type 3 and & disc type 3 G. Favre EN/MME

  39. Rough machining: oversize + 1 mm G. Favre EN/MME

  40. Rough machining: oversize + 1 mm G. Favre EN/MME