1 / 6

Development of a system prototype for control of industrial loads and dispersed electrical power plants on a distrib

Development of a system prototype for control of industrial loads and dispersed electrical power plants on a distribution electrical grid. Basic data about the project. Participants:. INEA d.o.o . , control and managment of industrial processes

isolde
Télécharger la présentation

Development of a system prototype for control of industrial loads and dispersed electrical power plants on a distrib

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of a system prototype for control of industrial loads and dispersed electrical power plants on a distribution electrical grid

  2. Basic data about the project Participants: • INEA d.o.o. , control and managment of industrial processes • Elektro Ljubljana d.d., electrical distributor, supplier • Količevo Karton d.o.o., paper plant • Koto d.o.o., waste processing plant • Livar d.d., foundry • PapirnicaVevčed.o.o., paper plant • EIMV, electric power research institute • Faculty of Electrical Engineering 2

  3. Basic data about the project • IJS , Slovenian scientific research institute • VBG d.o.o., creative design center Project lifetime From 21.1.2009 until 22.1.2010 Financing The part of the project is financed by European Union and Slovenian Technology Agency. 3

  4. KIBERnetVirtual Power Plant Product

  5. Site server – KIBERsik, KIBERbox Effects Product Overview Peak electricity reduction from 8% to 30% ( 13% on average) Cost reduction on electric power from 5% to 25% of electricity costs Optimal management of production and energy processes Increase of the internal security of energy supply Peak demand levelling system by load shedding Optimal management of local energy sources Optimal time scheduling of high energy consuming processes Power consumption and electric loads control 5

  6. KIBERnet Complete Solutions KIBERnet users • TSO • DSO • Supplier • Aggregator • Consumer • Producer • Prosumer Virtual Power Plant System 6

More Related