Development of the Electrical Power System in the Northwest

Development of the Electrical Power System in the Northwest. Dependence on hydropower - Atlas p. 101 Early non-federal projects - Skagit, Elwha Federal programs: Columbia/Snake R. rural electrification job creation Columbia Basin Project Bonneville Power Act - 1937

keaton
Télécharger la présentation

Development of the Electrical Power System in the Northwest

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of the Electrical Power System in the Northwest Dependence on hydropower - Atlas p. 101 Early non-federal projects - Skagit, Elwha Federal programs: Columbia/Snake R. rural electrification job creation Columbia Basin Project Bonneville Power Act - 1937 role of BPA vs. BuRec or COE the BPA preference clause - (1) public utilities, (2) private utilities, (3) DSI’s

  2. Public Investor Owned Systems

  3. Hydro System Principles & Development Annual water runoff probabilities “Critical water” Storage dams w/winter peak snowpack Canadian Storage Agreement Demand forecasts - PNUCC, BPA B:C Analysis & Congressional Support 1940’s through 1960’s Role of the Aluminum Industry & DSI’s.

  4. An Historic Drawing of Dam Elevations on the Columbia / Snake Hanford Reach

  5. Source: Hyde, p. 10

  6. 1994 Firm Power Demand Source: NWPPC 4th Electric Power Plan, Appendix D

  7. Firm & Non-Firm Electricity Sales Source: NWPPC 4th Electric Power Plan, Appendix D

  8. Seasonal Load Patterns, 1995 Source: NWPPC 4th Electric Power Plan, Appendix D

  9. Source: NWPCC 6th Northwest Power Plan, Appendix C

  10. Source: NWPCC 6th Power Plan, Appendix C

  11. Source: NPPC 5th Northwest Electric Power and Conservation Plan, Demand Forecast Appendix

  12. Typical Winter and Summer Weekday Load Shapes Source: NWPPC 4th Electric Power Plan, Appendix D

  13. Evolution of Planning PNUCC method of forecasting WEC lawsuit City Light Energy 1990 Study BPA studies vs. NRDC forecast Collapse of WPPSS projects - bond defaults in the wake of new forecasts Congress creates the NWPPC (Now NPCC) NPCC reliance on conservation

  14. The Hydro-Thermal Program Exhaustion of hydro sites by the late 1960’s The Northwest-Southwest Intertie Concept of the hydro-thermal program Washington Public Power Supply System 0r WPPSS BPA Notice of Insufficiency Impact of hydro-thermal system on river flows; fisheries/environmentalist lawsuits

  15. BPA vs. NRDC Forecast

  16. The Intertie Connections Were Justified On Grounds Related to Seasonal Complementary Demands in California And the Northwest: Winter space heating Demands in the PNW, Summer air conditioning Demands in California

  17. Source: Draft 6th PWPCC Power Plan, Appendix C

  18. Source: NWPCC 6th Northwest Power Plan, Appendix C

  19. Forecast Demand Growth Compared to Long-term Historical Trends Source: NWPPC Draft 4th Electric Power Plan, Appendix D

  20. Source: PWPCC Draft 6th Power Plan, Appendix C

  21. Source: NWPCC 6th Northwest Power Plan, Chapter 1

  22. Source: NWPCC 6th Northwest Power Plan, Chapter 1

  23. Source: NWPCC 6th Northwest Power Plan

  24. Source: NWPCC 6th Northwest Power Plan, Chapter 3

  25. Source: NWPCC Draft 6th Northwest Power Plan, Chapter 3

  26. Source: NWPCC 6th Northwest Power Plan, Chapter 4

  27. Source: NWPCC 6th Northwest Power Plan

  28. Source: NWPCC 6th Northwest Power Plan, Chapter 1

  29. RPS – Renewable Resource Portfolio Standard Source: NWPCC 6th Northwest Power Plan, Chapter 2

  30. An updated electricity demand forecast from PNPCC

  31. This figure is from the NWPCC midterm assessment of the 6th Plan Much wind power is exported to California NWPCC expects slower growth in these exports as photovoltaics are used to meet the California renewable resource requirement

  32. Other Issues Firm versus Interruptible Power Traditional long-term sales contracts versus “spot markets” Alternative energy sources: wind, solar, wood Deregulation & multi-source competition NPCC options approach Fish versus power

  33. Old Slides • The following slides are not for use in class • They are kept for reference purposes only

  34. Source: NPPC 5th Northwest Electric Power and Conservation Plan, Demand Forecast Appendix