190 likes | 334 Vues
The document outlines a comprehensive safety strategy and scope for various work packages related to technical equipment and infrastructure. It includes hazard and risk analysis, sources of hazards, and a preliminary hazard list specific to multiple disciplines and project phases. The safety concept emphasizes regulation compliance, safety scope documentation, and critical equipment in scope, such as accelerators and medical imaging devices. Future steps involve detailed planning and additional manpower allocation to ensure safety standards are maintained throughout project execution.
E N D
Safety concept and scope for WP Controls Fabian Moser February 5, 2010
Introduction F. Moser
Relation to overall project Work-Packages Disciplines Phases F. Moser
Overview F. Moser
Safety strategy F. Moser
Hazard and risk analysis F. Moser
Progress F. Moser
Step 1: Safety Concept document PM-090630-a-FMO F. Moser
Sources of hazards F. Moser
Structure of Preliminary Hazard List Perspectives (safety aspects) F. Moser
Content of Preliminary Hazard List F. Moser
Safety regulations F. Moser
Consequences of the Activity F. Moser
Step 2: Safety Scope document (REF) PM-100114-a-FMO F. Moser
Equipment in scope (ongoing) F. Moser
Preliminary Scope Map Gantry Accelerator Beam Delivery Rotator RFQ RFC Linac/IH Magnet Kicker Chopper Beam Energy Monitors Beam Interlock System Medical Technical Equipment Gantry Structure Alignment Equipment Infra-structure Devices Quality Assurance Dosimetry Equipment BID VAC BI Magnet Kicker Stop Beam Position Monitors Gantry PPS Patient Verification System Medical Imaging Devices SRC MAG PS Magnet Induction (Betatron) Beam Intenstity Monitors Patient Positioning System Medical Software Systems Control System Diagnostic Imaging Review Central Scheduler Treatment to machine conversion Accelerator Control System Beam Delivery Control System DTMI Gateway Patient Record and Verification System Supervisory Control System HIS/OIS Long Term Data Repository PACS Treatment Planning System A&A System Safety & Access Control System Building Automation System Infrastructure F. Moser Data import/export - external sites
Events in scope F. Moser
Required next steps Requires additional manpower F. Moser
Conclusions F. Moser