Procedural Generation of Virtual Cities for Computer Game Application
150 likes | 331 Vues
Procedural Generation of Virtual Cities for Computer Game Application. Bruce Megget Andrew Gits Francois Grobbelaar Liz Harte. Introduction. Virtual City Creation of an entire city using procedural techniques Population of the city with buildings, roads, people, and other objects
Procedural Generation of Virtual Cities for Computer Game Application
E N D
Presentation Transcript
Procedural Generation of Virtual Cities for Computer Game Application Bruce Megget Andrew Gits Francois Grobbelaar Liz Harte
Introduction • Virtual City • Creation of an entire city using procedural techniques • Population of the city with buildings, roads, people, and other objects • Benefits of Procedural Generation • Much faster development time with generated city • Enables almost endless amount of maps for gamer • Challenges • Can require a large amount of computer resources • Difficult to generate a “convincing” city
Background • Existing city-based games • Two ways to generate • Before Execution • Real-time • AI in games
Existing Games with Cities • Sim City 4 • Creation of unique cities • However, not procedurally generated - requires user interaction. • Burnout 3: Takedown • Massive detailed city • Painstakingly created from scratch by 3D artists, taking months of production time
Pre-Execution Generation • Lechner et al • City “grows”, following rules, simulating the growth of a real city. • Parish and Muller • Realistic road system generation using rules and constraints, based on existing road systems
Real-time Generation • Greuter et al • Generation of buildings geometry and texturing • Follows a grid-like road system • Descensor Engine • Generation of random worlds, following basic rules • Only generates as much detail as computer can handle
AI in Games • Textbooks • Practical advice on building game AI • Bots • Half Life & Quake • Monster AI • MODs
Goals • Creation of an immersive “living” city • Everything looks realistic • Elaborate visual detail • “living” people/cars moving about independently • Each generated city is unique • AI • People, interact with the environment around them • Cars following road system, traffic rules
Immersive “living” city • Common city elements • Traffic lights/road signs • Rubbish • Phone booths etc • People and Cars • Environment • Weather • Day/Night (lighting of scene) • Advertising • Anything else
AI in the city • Agents traversing • Active/Reactive • Wander • Goal Driven • Cars driving • Traffic signals • Road rules • Pedestrians
Project Plan so far • Choose an engine (week 2) • Finished collaborative framework (week 4) • Include road generation (week 4) • Finished building textures, building shapes and size generation, building placement etc (week 7) • Incorporated AI agents (week 8) • Realistic details of city (extras) completed (week 9)
Starting point • Commercial game engines • Usually only game-code source is available • Much more stable, very easy to use • Open Source game engines • Ability to modify any part of the engine source • Large community of developers continually improving engine
Commercial Game Engines • Quake (1, 2, or 3) • Older technology • Fast, efficient • Unreal 2 • Relatively old, but powerful • Similar to Quake engines • “Source” (Half-life 2) • Newer than previous two • Better for large open areas
Open Source Game Engines • OGRE • Crystal Space • Irrlicht • The Nebula Device
Conclusion • Many different paths to take • Aim to create an immersive living environment in the limited time we have • Any Questions?