SlideServe
Menu
Préférences
© SlideServe · v2026

The prefabricated metal buildings

jaden avatar
15 diapositives · 841 Views · Sep 28, 2010

The prefabricated metal buildings A strategy for the adoption of advanced Information Technologies Introduction Existing processes and business environment Available and suitable information technologies A framework target plan, including assessment of potential benefits

The prefabricated metal buildings - slide 1
01 / 15The prefabricated metal buildings
1 / 17

Télécharger la présentation

The prefabricated metal buildings
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. The prefabricated metal buildings A strategy for the adoption of advanced Information Technologies

  2. Introduction • Existing processes and business environment • Available and suitable information technologies • A framework target plan, including assessment of potential benefits • Assess the expected costs of achieving the plan • Analysis of the readiness for implementation of the framework plan • A detailed plan for the next incremental step

  3. Business Environment • What is the prefabricated metal buildings industry? • Composed of firms fabricating the components of complete low-rise nonresidential building systems • Categorized in the manufacturing industry section according to the Economic Census

  4. Business environment (Cont.) • An economic review • Popular as nonresidential structures • 65 percents share of nonresidential market compared with about 50 % in 1990 and 35 % in the early 1970s. (U.S. industry and trade outlook 2000) • Affordability, faster completion and occupation times, and high quality

  5. Business environment (Cont.) • The total number of companies is 603. • Added value is $1, 767, 827, 000. • Companies with less 20 employees are over a half among total • The majority of the output are the larger companies • Source: The 1997 Economic Census

  6. Processes environment • How are companies involved? • Companies can serve the consumers directly as a design-build team • Companies can be involved in the design process only • Companies can be involved in the manufacturing and erection process only • Companies can be the subcontractors and materials suppliers

  7. Processes environment (Cont.) • What activities exist? • Win contract to acquire project • Planning and scheduling • Design • Manufacturing and assembling • Storage and delivery • Erection

  8. Processes environment (Cont.)

  9. Available Information Technologies • A list of technologies being used • 2-D drawing • 3-D modeling: e.g. PresentationPlus 3D • Fabrication and assembly: CNC, CAM, Robotics • Interactive online system (Design, pricing, detailing, bill of materials, erection and fabrication drawing): e.g. QUESTmb

  10. Available Information Technologies (Cont.) • PresentationPlus 3D by Loseke Technologies, Inc. • Show the clients the building in color and in three dimensions • Can modify the building from size to location of openings then show the clients the results instantly.

  11. Available Information Technologies (Cont.) • Integrated online system by steelbuilding.com • Customers can choose the building dimensions and roof pitch, and accessories • The computerized design and pricing system • Produce a color image of the building and an itemized price including delivery charges • Automatically calculate shipping charges

  12. A frame target plan for simple buildings

  13. Assessment of potential benefits for simple buildings • Reducing direct cost of design • Reducing the time-From several weeks or months to several ours or minutes • Fabrication benefits with CNC • Reducing cost of detailing • Errors reduction

  14. Expected costs of achieving the plan • Items of expected costs for achieving • Software cost • Hardware cost • Maintaining cost

  15. Reference • Reference • U.S Department of Commerce, Bureau of the Census • The 1997 Economic Census: Manufacturing Industry Series • The 1997 Economic Census: Construction Industry Series • The U.S Industry and Trade Outlook 2000 • William D. Booth, Metal Building Contracting and Construction, 1999 • CNC fabrication, http://www.efunda.com/processes/metal_processing/cnc.cfm • American Straight Steel, http://www.americanstraightsteel.com/manufacturing.html • CAD/CAM http://www.geocities.com/cadcamworld/ • Steelbuilding.com http://www.insideselfstorage.com/articles/291spotl1.html • The link of metal buildings companies http://dmoz.org/Business/Construction_and_Maintenance/Materials_and_Supplies/Special_Construction/Metal_Building_Systems/