1 / 34

East Pelham TS Project

East Pelham TS Project. 2009 W-1. Alabaster SS. E. Pelham – Alabaster SS 115kV TL. Carriere Southwest 230/115 kV Project. 2010 W-2. New Kiln – Carriere SW 230 kV T.L. C.A.E.S. Generation Addition / APCO TL Impacts. 2010 W-3a.

janetjones
Télécharger la présentation

East Pelham TS Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. East Pelham TS Project 2009 W-1 Alabaster SS E. Pelham – Alabaster SS 115kV TL

  2. Carriere Southwest 230/115 kV Project 2010 W-2 New Kiln – Carriere SW 230 kV T.L.

  3. C.A.E.S. Generation Addition / APCO TL Impacts 2010 W-3a 356 MW GENERATION ADDITION TOTAL GENERATION CAPACITY = 694 MW (12-31-2010) CIBA SPECIALTY CHEMICALS WASHINGTON CO. CO-GEN BAY GAS PRAXAIR CT ST OLIN CORP. WEST MCINTOSH T.S. C.A.E.S. MCINTOSH T.S. “B” LINE TATE & LYLE SUCRALOSE McIntosh T.S. – C.A.E.S. 115kV TL Bundled (2) 795 45/7 ACSR, R = 2126 A TL Loading = 122% (2602 A) 2011 Summer Peak Washington County #1 Off Loss of West McIntosh – C.A.E.S. 115 kV TL “A” LINE 2010 Winter Loading = 106% (2489 A) BARRY S.P. ELLICOTT T.S. BARRY S.P.

  4. Planned Improvements for McIntosh Area 2010 W-3b UPGRADE THE C.A.E.S. AND BARRY “B” 115KV TERMINALS AT MCINTOSH T.S. TO 3000A. UPGRADE TRANSFER SWITCHES AND BREAKERS TO 3000A. (12-31-2010) CIBA SPECIALTY CHEMICALS WASHINGTON CO. CO-GEN BAY GAS PRAXAIR CT C.A.E.S. ST LOWMAN OLIN CORP. WEST MCINTOSH T.S. MCINTOSH T.S. MCINTOSH SW TL RECONDUCTOR: MCINTOSH T.S. – BAY GAS – C.A.E.S. 115KV CIRCUIT #2 1.47 MI BUNDLED (2) 795 26/7 ACSS, R = 2908A (Spring 2010) “B” LINE TATE & LYLE SUCRALOSE LOOP BARRY S.P. – MCINTOSH T.S. “B” 115KV TL INTO C.A.E.S. (POWERSOUTH TO CONVERT BUS AT C.A.E.S. TO A BREAKER AND HALF) (12-31-2010) TL RECONDUCTOR: MCINTOSH T.S. – C.A.E.S. 115KV CIRCUIT #1 1.47 MI BUNDLED (2) 795 26/7 ACSS, R = 2908A (Fall 2010) “A” LINE BARRY S.P. ELLICOTT T.S. BARRY S.P.

  5. 2011 W-4 Laguna Beach 230 / 500 kV Substation Laguna Beach Substation

  6. Laguna Beach – Holiday 115 kV T.L. Holiday – Hathaway Tap 115 kV T.L. 2011 W-5 Laguna Beach – Holiday 115 kV Line Holiday – Hathaway Tap 115 kV

  7. Smith – Laguna Beach 115 kV Transmission Line 2011 W-6 Smith – Laguna Beach Line Conversion to 230 kV

  8. Networked Mobile 115 kV Transmission System RACETRACK DS NORTH MOBILE 2012 W-7 LOTT ROAD SEMMES DS CHICKASAW #4 (2015) #5 (2015) #6 (2015) #1 N CRICHTON SS #3 (2014) ORCHARD CRICHTON WOLF RIDGE ALPINE #7 (2015) SCHILLINGER RD SPRINGHILL DS WHEELERVILLE BEL AIR BIG CREEK SOUTH MOBILE DS U.S.A. W. GRELOT RD SPRINGDALE DS #8 (2015) PROVIDENCE MICHAEL BLVD DS McDUFFIE ISLAND GRELOT RD SNOW RD DS SKYLAND DS DAWES DS COTTAGE HILL DS NAVCO DS LYNNDELL DS #10 (2016) HALLS MILL RD DS DEMETROPOLIS DS DOG RIVER DS #2 (2012) CLOVERLEAF DS #9 (2015) DEE’S DS KRONER DS THEODORE DS NORTH THEODORE

  9. Shoal River – Santa Rosa – Laguna Beach 230 kV T.L. 2012 W-8 New Shoal River – Santa Rosa 230 kV TL (73 miles) Shoal River Substation Laguna Beach Substation Santa Rosa Substation

  10. Hillabee Danway SS N. Opelika N. Auburn Goatrock Franklin CC 2013 W-9 2013 W-10 Hillabee – Danway S.S. 230 kV T.L. Upgrade Hillabee – North Opelika 230 kV T.L. Upgrade Upgrade Hillabee – North Opelika 230kV Line – 38 miles Upgrade Hillabee – Danway 230kV Line – 32 miles

  11. Barry – Chickasaw 230 kV T.L. 2013 W-11 Reconductor the Barry – Chickasaw 230 kV TL (19.2 miles)

  12. Plant Greene County Substation 2013 W-12 Green County – Duncanville 230 kV T.L. CPL EPES MANNINGTON WOOD FLOORS Add 400MVA 230 / 115 kV Autobank EPES Greene County – Meridian NE 230 kV T.L. BIRDEYE D.S. PLANT GREENE COUNTY LIVINGSTON BIRDEYE T.S. DEMOPOLIS Green Co. – N. Selma 230 kV T.L. SONAT GALLION WEST DEMOPOLIS CEMEX FAUNSDALE BELLAMY S.S. DEMOP. IND. PK. BW EMC COATOPA BELLAMY CUBA ROCK –TENN SONAT YORK Greene County – Sykes S.S. 230 kV T.L. LINDEN

  13. Pinckard – Slocomb 115 kV T.L. 2013 W-13 Slocomb – AL / FL Line 115 kV T.L. 2014 W-14 Rebuild Pinckard – Slocomb – Holmes Creek 115 kV TL (23 miles)

  14. Snowdoun – Pike Co. 230 kV T.L. 2014 W-15 Madison Park W. Montg Montg. SS S. Montg Dixie ECI Cecil Hope Hull Snowdoun Upgrade 32.42 miles Snowdoun – Pike Co 230kV TL to 100ºC Union Springs Pike Co Troy S.S City of Troy Luverne

  15. 2014 W-16 Kemper County Generation

  16. 2009 W-17 Gaston – East Pelham 230 kV T.L. Gaston – Twelve Oaks – E. Pelham 230 kV TL

  17. PLANT GORGAS TAYLORS FERRY SONAT BANKHEAD DAM EL PASO SHOAL CREEK LAKELAND CARROLLS CREEK YACHT CLUB KELLERMAN JWR #4 STANSEL GORDO J.W. #5 FAYETTE HWY. TUSC. T.S. TO GORDO HOLT DAM LAKEVIEW HOLT T.S. HUNT OIL SOUTH BESSEMER T.S. MERCEDES GOODRICH BLACK WARRIORROMULUS EUTAW HWY SOUTH TUSC. T.S. ALICEVILLE STOKES BRADLEY ROAD ENGLEWOOD BIG SANDY DUNCANVILLE S.S. COLONIAL D.S. CPL MOUNDVILLE GULF STATES PAPER BLACK WARRIOR LEWISTON EUTAW PPL AKRON CPL EPES EPES T.S. MANNINGTON WOOD FLOORS LIVINGSTON BIRDEYE T.S. BIRDEYE D.S. PLANT GREENE COUNTY 1257 MW Generation 2016 W-18 Tuscaloosa Solution Phase 2 South Tuscaloosa T.S. New South Duncanville 230 / 115kV Substation New Epes – Eutaw 115 kV T.L. (22.5 miles)

  18. 2016 W-19 Barry – Crist 230 kV T.L. Upgrade Barry – Crist 230 kV T.L. to 125 degree C Operation from Alabama State Line to Plant Crist

  19. Orange Grove 230/115 kV Substation Project Reconductor 2.5 mile 230 kV Line with 1033 ACSS at 200°C 2017 W-20

  20. Elmore County Area 2019 W-21 2019 W-22 New 30 mile Elmore County-Madison Park 230 kV Line Gaston Steam Plant New Elmore County 800MW CC Plant Bouldin Dam Wetumpka TS Elmore Russell Coosa 1 & 2 Wetumka DS ECI Speigner Reconductor County Line Road – Elmore County 230 kV Line – 18.2 miles County Line Rd Cent AL ECI Redland Rd Robinson Springs Millbrook Prattville ECI Prattville Prattmont E. Prattville S. Prattville Madison Park TS IP Prattville Madison Park Forbes Rd Gunter Park Gunter AFB N. Mont Capitol Heights . Hunter SS S. Gunter Park Eastdale Maxwell AFB West Mont Mt Meigs Autaugaville Jeff St E. Mont. State Capitol Mont SS AUM Montgomery WW Dixie ECI Arrowhead Washington Park Holt St Carter Hill Rd . Woodmere Masonic Home To Snowdoun

  21. 2011 PS-1 Liberty– Defuniak 115 kV T.L. Liberty Defuniak

  22. 2011 PS-2 Dale County – Bay Springs Junction Upgrade line to 100 deg C operation (167) MVA Dale County Bay Springs

  23. 2012 PS-3 Clio Area Upgrades Current 62 MVA Path limited under contingencies Current 62 MVA Path limited under contingencies

  24. MIFLIN JCT. New 115 kV line 115 kV line Uprate Capacitor Additions 2012 PS-4 Baldwin County Alabama Wolf Bay Miflin Junction Florida Avenue

  25. 2012 PS-5 Brewton – Freemanville 115 kV T.L. Uprate line to 100 deg C operation (142 MVA) Brewton Freemanville

  26. 2014 PS-6 Northern System Voltage Problem Gantt-Fuller 115 or 230kV line

  27. 2009 SME-1 Cole Road Transformer

  28. 2010 SME-2 Polkville 161 kV Source

  29. 2010 SME-3 Purvis Bulk Transformer Upgrade

  30. 2011 SME-4 Silver Creek Interconnection

  31. 2012 SME-5 Moselle 161 kV Generation Expansion

  32. 2012 SME-6 South Hoy 161 kV Source

  33. 2013 SME-7 Prentiss 161 / 69 kV Substation

  34. 2017 SME-8 East Waynesboro 230 / 69 kV

More Related