1 / 7

Engineering and Project Management Services for Water Withdrawal Permitting and Treatment Study

This Request for Qualifications invites engineering and project management services for a water withdrawal permitting and treatment pilot study. Led by Jeff Field, Executive Director, this session includes a historical overview of the Lake County Water Supply Corporation (LCWSC), an examination of the existing and proposed water systems, and discussions on plant and intake sites. Participants will engage in an interactive Q&A, ensuring all concerns and inquiries regarding the project are addressed effectively.

jaron
Télécharger la présentation

Engineering and Project Management Services for Water Withdrawal Permitting and Treatment Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REQUEST FOR QUALIFICATIONS ENGINEERING AND PROJECT MANAGMENT SERVICES FOR WATER WITHDRAWAL PERMITTING AND TREATMENT PILOT STUDY May 28, 2014

  2. WELCOME AND INTRODUCTION • JEFF FIELD, EXECUTIVE DIRECTOR • TODAY’S AGENDA • LCWSC HISTORY • PROJECT BACKGROUND

  3. TECHNICAL OVERVIEW • KEVIN ANDERSON, DIRECTOR OF ENGINEERING AND OPERATIONS • EXISTING WATER SYSTEM • PROPOSED WATER SYSTEM • PLANT SITE and INTAKE SITES

  4. Existing Water System

  5. Proposed Water System

  6. PLANT AND INTAKE SITES

  7. Questions and Answers • Introductions by Participants • Summary of Questions to date • Additional Questions

More Related