1 / 31

Richard Coluzzi Design and Project Coordinator President, RJC Designs

Richard Coluzzi Design and Project Coordinator President, RJC Designs. David Lees, Ed.D. Director, Instructional Technology and Distributed Learning. "Form follows function.". "Form follows function." Louis Henri Sullivan Sept. 3, 1856 - Apr. 14, 1924. Auditorium Building

jayme
Télécharger la présentation

Richard Coluzzi Design and Project Coordinator President, RJC Designs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Richard Coluzzi Design and Project Coordinator President, RJC Designs David Lees, Ed.D. Director, Instructional Technology and Distributed Learning

  2. "Form follows function."

  3. "Form follows function." Louis Henri Sullivan Sept. 3, 1856 - Apr. 14, 1924 Auditorium Building Address: 430 S. Michigan Ave.Year Built: 1886-90Architect: Adler & Sullivan

  4. “Form follows function - that has been misunderstood. Form and function should be one, joined in a spiritual union.”

  5. “Form follows function - that has been misunderstood. Form and function should be one, joined in a spiritual union.” Frank Lloyd Wright (1867-1959)

  6. Technology of the Day Chalk Blackboard School Bell • Thru 12 Utilizing a total Of 60 sq. ft.

  7. Mandeville Hall St. Joe’s University Philadelphia, Pa. Square Ft : 88,000 Architect: BHRK / Phila. RJC Designs Inc. Technology Consultants Design Development Project Management

  8. A Modern Higher Education Facility Six Electronic Classrooms Faculty Development Room One Multi-Point DLC Dinning/Presentation Room Four Seminar Rooms Computer Labs One VTC Seminar Room Master Control Head End Two Moot Board Rooms Synergy/Media Retrieval One Moot Observation Room Moot Control Room One Teletorium VTC/Presentation Teletorium Control/Production

  9. Integration of Form with Function ADA REQUIREMENTS NEW CODE ISSUES ENVIRONMENTAL TECHNOLOGY ERGONOMICS

  10. Seamless Integration of Technology and Facility

  11. Development Time Lines Never to Early to begin planning for Technology • Program • Budget • Architect • Technology Consultant • Design Build Firm Program Budget Architect Tech Con Installer

  12. Time Lines and Process In the beginning….. Understanding the Big Picture Development of a Program Budget Development Design Equipment List Transferring the Technology Plan to Mechanical and Electrical Needs Supervision Installation Acceptance

  13. Time Lines and Process In the beginning….. Involvement Decisions with little Or no information And the magic number is….. Critical Time

  14. Time Lines and Process Understanding the Big Picture • Architecture / Infrastructure • Room Ergonomics • Budget • Coordination of Tech and Environment • Pedagogical Considerations • Training / People • Staffing • On going maintenance / upgrades • We will get back to those !!!

  15. Technology Pedagogy Time Lines and Process Who’s Driving The Plan

  16. Time Lines and Process Development of a Program • How the space is to be used • Connectivity between spaces • Shared resources • Desired technology formats • Video applications • General functionality……….

  17. Who Owns the Classroom? • Facilities • Academics • The Registrar • IT • Some Combination • Somebody will need to maintain to the room.

  18. Time Lines and Process Budget Development Agreeing on what is in the technology budget • Furniture • Computer • Voice/Data • Electric • Cooling • ADA Requirement • Consulting Fees • Oh Ya….A/V equipment…..

  19. Time Lines and Process Design Little of this a little of that

  20. Time Lines and Process Equipment List Control Considerations 4x3 vs. 16x9 Digital Consideration Video Storage IP based equipment Wireless considerations

  21. Control Systems

  22. Screens http://www.projectionscreens.com.au/

  23. Screens Size Rules of Thumb • Max Viewing Distance • Video = 10-12 x Image Height • Data = 6-8 x Image Height • Min Viewing Distance • Video and Data = 2 X Image Height • Bottom of Screen should be 3.5” to 4” above the floor. • http://www.ustechelectronics.com/choosing.html • Manual v. Electric 16x9 / 4x3 • Tension Tab • Screen Gain

  24. Data/Video Projectors • Manufacturers • LCD v. DLP • Brightness • Resolution • Size • Noise www.projectorcentral.com

  25. Time Lines and Process Transferring the Technology Plan to Mechanical and Electrical Needs

  26. Time Lines and Process Supervision The Most Dreaded Phrases in a Project We have it under control It’s a coordination issue Sounds like a change order The slab is being poured tomorrow Floor box…what floor box ? Ya..controlled lighting….On/Off What !…You want a projector where that sprinkler head is Why is furniture part of the technology budget?

  27. Time Lines and Process Installation Time line coordination of installation and classroom schedule Integration of Equipment Management of the installation Fit and Finish inspections

  28. Time Lines and Process Acceptance Installation inspection approval

  29. Time Lines and Process Understanding the Big Picture • Training / People • Staffing • On going maintenance / upgrades

  30. “The Point Being” Early Technology Program Development followed by CAREFUL Infrastructure Planning can help assure A Seamless Integration of Technology and Facility

More Related