An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kingdom of MoroccoMinistry of Land-Use Management, Water and the Environment Moroccan CDM projects Renewable energy projects The First Carbon Exhibition in North Africa and Middle East Region Djerba, 22-24 September 2004 M’hammed EL MERINI SCET Maroc elmerini@scet.ma CD4CDM Project

  2. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Renewable energy projects Summary 7 renewable energy projects: • Essaouira 60 MW wind farm (ONE) • Tangiers 140 MW wind farm (ONE) • A. Torres 50 MW wind farm (ONE) • Tan Tan 10 MW wind farm (ONEP) • Tetouan 10 MW wind farm (LAFARGE) • Tanafnit 41 MW Hydropower dam (ONE) • 105,000 photovoltaic kits in rural area (ONE)

  3. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Renewable energy projects Description and distribution Renewable energy projects represent a potential of 9.7 million CER, that is 60% of the total CER of Moroccan approved CDM projects. • Wind power is for 81% of the CER (7.85 million), then Hydro with 16% (1.59 million), and solar with 3% (0.27 million). • The projects promoters are ONE (National Office of Electricity) with 94% of the CER (9.19 million), then LAFARGE (private cement factory) with 4% (345,000) and ONEP (National Office of Drinking Water) with 2% (172,400).

  4. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Renewable energy projects Location Photovoltaic kits

  5. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Wind power projects 3 full size projects 2 small scale projects

  6. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Essaouira 60 MW wind farm Project summary • Full name :Power generation at Essaouira 60 MW wind farm; • Location : At Cap Sim, 15 km far from Essaouira; • Category : Renewable energy – Grid connected power generation; • Project promoter :Office National d’Electricité (ONE), public office; • Project status : PDD approved; • Date of operation : 2006; • First year of CER delivery : 2006; • Crediting period : 2006-2015; • Expected CER : 1.5 million.

  7. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Essaouira 60 MW wind farm Project description • Technical features : • Installed capacity : 60 MW using the wind power technology; • Expected production : 210 GWh per year; • Components : 71 horizontal axis wind turbines of 850 kW each, electronic devices for regulation and protection, LV/MV and MV/HV transformers, to supply the national grid at 60 kV. • Financial issues : • Total cost of the project : US $ 82.5 million • Timing : • Starting of works : end of 2004 ; • Operation : 2006.

  8. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tangiers 140 MW wind farm Project summary • Full name :Power generation at Tangiers 140 MW wind farm; • Location :At Beni Mejmel, 12 km to the east of Tangiers and Dhar Saadane, 22 km to the south-east of Tangiers; • Category : Renewable energy – Grid connected power generation; • Project promoter :Office National d’Electricité (ONE), public office; • Project status : PIN approved; • Date of operation : 2007; • First year of CER delivery : 2007; • Crediting period : 2007-2016; • Expected CER : 4 million.

  9. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tangiers 140 MW wind farm Project description • Technical features : • Installed capacity : 140 MW using the wind power technology; • Expected production : 510 GWh per year; • Components : 165 horizontal axis wind turbines of 850 kW each, electronic devices for regulation and protection, LV/MV and MV/HV transformers, to supply the national grid at 225 kV. • Financial issues : • Total cost of the project : US $ 170 million (Euro 148 million) • Timing : • Starting of works : May 2004 ; • Operation : 2007.

  10. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 A. Torres 50 MW wind farm Project summary • Full name :Power generation at A. Torres 50 MW wind farm; • Location : At Taghramt, 10 km far from Tetouan city; • Category : Renewable energy – Grid connected power generation; • Project promoter :Office National d’Electricité (ONE), public office; • Project status : PIN approved; • Date of operation : 2007; • First year of CER delivery : 2007; • Crediting period : 2007-2016; • Expected CER : 1.83 million.

  11. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 A. Torres 50 MW wind farm Project description • Technical features : • Installed capacity : 50.4 MW using the wind power technology; • Expected production : 225 GWh per year; • Components : 84 horizontal axis wind turbines of 600 kW each, electronic devices for regulation and protection, LV/MV and MV/HV transformers, to supply the national grid at 225 kV. • Financial issues : • Total cost of the project : US $ 62 million • Timing : • Starting of works : June 2005 ; • Operation : 2007.

  12. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Full size wind farm projects Baseline methodology • Methodology : • Used in “Wigton wind farm in Jamaica” and submitted to CDM EB. • New consolidated methodology ACM0002 will be used in new PDD version. • Approach : • Demonstrate that the project is not BAU; • Determine the most likely scenario in absence of the project; • Determine the avoided emissions by calculating the Projected Operating Margin with weighted CEF of the national power plants ; • Calculations : • Through the crediting period, the weighted CEF moves down from 0.805 (2006) up to 0.729 (2009) and then increases to 0.777 (2015);

  13. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tan Tan 10 MW wind farm Project summary • Full name :10 MW wind farm for the Tan Tan SWDP; • Location : At Sidi El Gran, 12 km to the north of Tan Tan city; • Category : 1-D : Renewable energy production for the grid; • Project promoter :ONEP – public agency; • Project status : PIN approved – PDD completed; • Date of operation : 2007; • First year of CER delivery : 2007; • Crediting period : 2007-2016; • Expected CER : 194,500.

  14. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tan Tan 10 MW wind farm Project description • Technical features : • Installed capacity : 10 MW using the wind power technology; • Expected production : 22.5 GWh per year; • Components : 20 horizontal axis wind turbines of 500 kW each, electronic devices for regulation and protection, LV/MV transformers, to supply the national grid at 22 kV. • Financial issues : • Total cost of the project : US $ 36 million (including the SWDP). • Timing : • Starting of works : 2005 ; • Operation : 2007.

  15. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tetouan 10 MW wind farm Project summary • Full name :10.2 MW wind farm for the Lafarge cement factory; • Location : At Semsa site, to the north-west of Tetouan city; • Category : 1-D : Renewable energy production for the grid; • Project promoter :LAFARGE – private company; • Project status : PIN approved – PDD completed; • Date of operation : 2007; • First year of CER delivery : 2007; • Crediting period : 2007-2016; • Expected CER : 345,000.

  16. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tan Tan 10 MW wind farm Project description • Technical features : • Installed capacity : 10.2 MW using the wind power technology; • Expected production : 42.3 GWh per year; • Components : 12 horizontal axis wind turbines of 850 kW each, electronic devices for regulation and protection, LV/MV transformers, to supply the national grid at 22 kV. • Financial issues : • Total cost of the project : US $ 10 million. • Timing : • Starting of works : 2005 ; • Operation : 2007.

  17. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Small scale wind farm projects Baseline methodology • Methodology : • Described in paragraph 29 of Appendix B of the simplified M&P. • Approach : • Demonstrate that the project is not BAU; • Determine the most likely scenario in absence of the project; • Determine the avoided emissions by calculating the Combined Operating Margin with recent additions weighted CEF of the national power plants ; • Calculations : • Through the crediting period, the CEF moves down from 0.896 (OM) to 0.836 (RA);

  18. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Other projects Hydropower station Photovoltaic kits

  19. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tanafnit hydropower station Project summary • Full name :Tanafnit / El Borj 41 MW hydropower station; • Location : At Tanafit, 40 km to the north-east of Khenifra city; • Category : Renewable energy – Grid connected power generation; • Project promoter :Office National d’Electricité (ONE), public office; • Project status : PIN approved; • Date of operation : 2007; • First year of CER delivery : 2007; • Crediting period : 2007-2016; • Expected CER : 1.6 million.

  20. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tanafnit hydropower station Project description • Technical features : • Installed power : 41.4 MW; • Expected production : 206 GWh per year; • Components : Derivation from dam through a 3 m diameter pipe over 3 km to Tanafit hydropower station and through a 3.5 m diameter pipe over 10.6 km to El Borj hydropower station. • Financial issues : • Total cost of the project : US $ 102.5 million • Timing : • Starting of works : end of 2004; • Operation : 2007.

  21. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Tanafnit hydropower station Baseline methodology • Methodology : • Projected Operating Margin (as in the wind farm projects). • New consolidated methodology ACM0002 will be used in new PDD version. • Approach : • Demonstrate that the project is not BAU; • Determine the most likely scenario in absence of the project; • Determine the avoided emissions by calculating the Projected Operating Margin with weighted CEF of the national power plants; • Calculations : • Through the crediting period, the weighted CEF moves down from 0.809 (2007) up to 0.729 (2009) and then increases to 0.782 (2016);

  22. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Photovoltaic kits in rural areas Project summary • Full name :Electricity supply of 105,000 rural houses by photovoltaic kits; • Location : Around 50 different rural regions in Morocco; • Category : 1-A : Electrical energy production by the user with no connection to the national grid; • Project promoter :ONE – public agency; • Project status : PIN approved – PDD on progress; • Date of operation : • Phase 1 : 16.000 kits (2.000 in 2003 – 5.000 in 2004 – 7.000 in 2005 – 2.000 in 2006); • Phase 2 : 12.000 kits (6.000 in 2005 – 6.000 in 2006); • Phase 3 : 37.000 kits (10.000 in 2005 – 14.000 in 2006 – 13.000 in 2007); • Phase 4 : 40.000 kits (10.000 per year, from 2006 to 2009). • First year of CER delivery : 2007; • Crediting period : 2007-2016; • Expected CER : 268,000.

  23. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Photovoltaic kits in rural areas Project description • Technical features : • Installed capacity : 14 MW using the solar power technology; • Expected production : 30.7 GWh per year; • Components : 105,000 photovoltaic kits of 133 W, operating 6 hrs/d, with domestic circuits supplying 4 lamps and a plug. • Financial issues : • Total cost of the project : US $ 180 million. • Timing : • Starting of works : 2003 ; • Operation : 2006 (phase 1 & 2) – 2007 (phase 3) – 2009 (phase 4).

  24. The first Carbon exhibition in North Africa and Middle East region – Djerba, September 22-24, 2004 Photovoltaic kits in rural areas Baseline methodology • Methodology : • Described in paragraphs 4 & 6 of Appendix B of the simplified M&P. • Approach : • Demonstrate that the project is not BAU; • The scenario in absence of the project is Diesel generation units; • Determine the avoided emissions by calculating the Combined Operating Margin with recent additions weighted CEF of the national power plants ; • Calculations : • Through the crediting period, the CEF moves down from 0.896 (OM) to 0.836 (RA);

  25. For more informations :Permanent Secretariat of CDM National CouncilClimate Change Unit Directorate of Partnership, Communication and Cooperation Ministry of Land-Use Management, Water and the Environment36 Avenue Al Abtal –Rabat –Morocco Tel/Fax : +212 37 68 17 59 Tel/Fax: +212 37 77 47 88rcmdp@mtds.comucc@mtds.comwww.mdpmaroc.com

More Related