1 / 12

GSC Report

GSC Report. Simon Morris (Durham University, GSC Chair). Outline. The ‘New’ GSC Agenda for Oct 18 2007 GSC Meeting. The ‘New’ GSC.

jera
Télécharger la présentation

GSC Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GSC Report Simon Morris (Durham University, GSC Chair)

  2. Outline • The ‘New’ GSC • Agenda for Oct 18 2007 GSC Meeting

  3. The ‘New’ GSC • The Gemini Science Committee provides the Observatory and the Gemini Board with strategic and near-term advice on scientific issues. This includes the content of the on-going instrumentation program and scientific performance requirements for the telescopes and instrumentation. The GSC is expected to be represented at the annual strategic planning activities of the Observatory and to actively participate. • The GSC in whole or in part may assist the Director by functioning as a User Committee by assessing the Observatory's responsiveness to the national scientific communities.

  4. Prof. Simon Morris (Chair) Dr. Timothy C. Beers Dr. Simon Casassus Dr. Scott Croom Dr. Rene Doyon Dr. Nancy A. Levenson Dr. Ross J. Mclure Dr. Christopher C. Packham Dr. Suzie Ramsey-Howatt Dr. Henry G. Roe Dr. Basilio Santiago Prof. Alan Stockton Dr. Chris Willott The ‘New’ GSC

  5. Agenda for Oct 18 2007 GSC Meeting • Copy of agenda on UK 8m UG web site • Docs for meeting distributed Monday 8/10/07 • Deployment of Gemini instruments on GN/GS = Long Range Plan • Scientific priorities at Gemini for 2008 = Short Term Priorities • Discussion of User Issues

  6. Red CCDs for GMOS N. The GSC still holds to a specification of ‘competitive with FORS2’ ALTAIR LGS With NIFS (and NIRI with PSF variable) – option for no field lens larger TT sky coverage Larger FOV for TT with field lens (goal to get comparable sky coverage to Keck LGS) Improve the operational elevation from ≥ 59 deg to ≥ 30 deg Goal of comparable IQ to Keck LGS Blind offset ability for GN (and GS) – GMOS high priority MICHELLE Eliminate image elongation which is impacting science output Dual beam chopping/guiding Increase chop throw to 30” Spectropolarimetry NICI Commissioning System Verification Start of science campaign FLAMINGOS 2 (see above for some discussion of the GSC opinion on the relative priority of Flamingos 2 and MCAO) Commissioning System Verification Demo science MCAO System Verification GSAOI Flamingos-2 MCAO science operation readiness Red CCDs for GMOS S . The GSC still holds to a specification of ‘competitive with FORS2’. NB First priority for red CCDs is GMOS N. Blind offset ability for GS – GMOS, GNIRS high priority Short Term Priorities

  7. OPC Report Simon Morris (Durham University, OPC Chair)

  8. Outline • P80 • Laboca Delta Call • P81

  9. P80 • 878 Normal proposals and 14 Large proposals • The numbers of subpanels was increased (from 10 to 12) and the amount of time for subpanel discussion and ranking of the proposals was also increased (from ~ 2 to ~2.5 days) • The OPC approved the continuation of all the ongoing Large Programmes. The specific case of the zCOSMOS survey by Lilly et al. was discussed, and its continuation supported despite a possible need to take 4 years to complete. • The overall demand per telescope remains high for almost all telescopes.

  10. Pressure factor shown as time requested for all classes of proposal (including Large) divided by the time available

  11. Laboca Delta Call • Laboca available for limited number of nights (2 runs, ~26 nights) for ESO during P80 • Separate meeting of a panel • Some ‘large’ programmes recommended (e.g. Smail et al. survey of ECDFS) • Merged with Apex-2A and Flash

  12. P81 • 3 ‘Procedures’ documents on UK 8m UG web site • Feedback (presented in March 2007) • Panel Chair Guidelines • Large Programme Procedures • Chair got list of proposals and panel members today (wed 10/10/07). Hotel broadband too slow to download…

More Related