1 / 19

Modeling of the Potential for Vertically Downward Saltwater Migration from a Dredge Pond

Modeling of the Potential for Vertically Downward Saltwater Migration from a Dredge Pond. Peter F. Andersen 1 , Lisa M. Grogin 1 , and Ronald L. Bartel 2 1 GeoTrans, Inc., Roswell, Georgia, United States 2 Northwest Florida Water Management District, Havana, Florida, United States.

jera
Télécharger la présentation

Modeling of the Potential for Vertically Downward Saltwater Migration from a Dredge Pond

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modeling of the Potential for Vertically Downward Saltwater Migration from a Dredge Pond Peter F. Andersen1, Lisa M. Grogin1, and Ronald L. Bartel2 1GeoTrans, Inc., Roswell, Georgia, United States 2Northwest Florida Water Management District, Havana, Florida, United States

  2. Problem Statement • Desire to deposit dredge materials from saltwater body into inland barrow pit • Two concerns: • Saltwater (from dredge slurry) will migrate vertically downward and contaminate a public supply well 1800 ft away (short-term + density dependent) • Dredge materials will migrate from sediments into aquifer (long-term + non-density dependent • Are current and future hydraulic gradients sufficient to contain the dredge materials and prevent contamination of the well and aquifer?

  3. Conceptual Model of Question to be Answered Water Supply Well Stream Pond Dredge Pond To Stream? To Well?

  4. Approach • Characterization of flow system • Time series analysis of hydraulic gradients • Numerical modeling to assess and demonstrate physics of flow • Development of metrics for: • Allowing dredging to begin • When dredge deposition would need to stop • Development of groundwater and surface water monitoring plans

  5. Project Location

  6. Model Construction (Plan View) Dredge Pond Stream Ponds Water Supply Well

  7. Model Construction: Vertical Jackson Branch South Pond North Pond

  8. Model Details • SEAWAT-2000 • Calibration (steady state flow) • 17 heads, 3 multilevel wells • ME = 0.19 ft; MAE = 0.35 ft (7.8% of variation) • Predictive simulations • Lower head in pond from 3.7 ft to 2 ft • Concentration of saltwater in pond = 12,700 ug/L • Saltwater concentration active for 6 months • 10 weeks dredging • 16 weeks residence time • Various configurations of boundary heads to represent: • Regional water level changes • Well pumping

  9. Scenarios Evaluated • Minimum Operating Conditions • Base case boundary heads • Conservative 0.5 ft upward head gradient at monitor well (1 ft required; 3-6 ft typical) • Explicit Inclusion of Pumping Well • Implicitly incorporated in BCs • Additionally included by superimposing Hantush-generated heads on BCs • Worst Case • 2 ft downward gradient occurs immediately • Lasts entire 6 months of dredging

  10. Minimum Operating Conditions

  11. Explicit Inclusion of Pumping Well

  12. Worst Case (Head Gradient Reversal)

  13. Condition below which dredging could not commence: 2.5 ft NGVD in DW3 2 std dev below wet season high; 2 std dev above drought condition low Condition that dredging would stop: Upward gradient of < 1 ft at PZ-19 / DW3 monitor well Performance Metrics for Dredging

  14. Postscript • Dredging finally commenced March 28, 2008 and was completed 3 weeks later

  15. Postscript • An upward gradient between the Deep and Shallow system was present during the entire operation

  16. Postscript • An estimated 200,000 cu yds of sediment was removed from Bayou Chico • Monitoring will continue for 3 years: • Groundwater levels • Groundwater concentrations • Surface water concentrations • Remediation could be triggered by exceeding of groundwater concentration limits

  17. Conclusions (1) • An unusual saltwater intrusion problem! • Numerical model was useful to assess and demonstrate effects of scenarios • Model helped fill in gaps monitoring network • Only worst case scenario—a reversal of gradient—created a potential problem • Head and gradient metrics were established to prevent loss of containment from pond

  18. Conclusions (2) • Example of use of modeling, time series analysis, and monitoring to ensure success • Actual result was positive and (so far) in line with model predictions • Length of dredging was overestimated: 10 weeks vs 3 weeks actual; another conservative modeling assumption

  19. Questions? Pete Andersen GeoTrans, Inc. Roswell, Georgia, USA E-mail: pandersen@geotransinc.com Phone: 770 642 1000