This presentation outlines the objectives, roles, and evaluation criteria for WP7 within the Computer Engineering and Networks Laboratory at ETH Zurich, led by Prof. Dr. Bernhard Plattner. Key partners include ETH, LAN, and Demokritos. We discuss the laboratory's responsibilities in quality assessment and progress monitoring based on deliverables and internal reports. The presentation also covers the defined interfaces for coordination and outlines the procedures for evaluation. Finally, we present the next steps, including preparing an interim report and establishing a quality assessment framework.
E N D
WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner 1 WP7 Presentation
Overview • WP7-Partners • Objectives • Role • Interfaces • Criteria • Procedure • Summary • Next Steps 2 WP7 Presentation
WP7 -- Partners Swiss Federal Institute of Technology ETH LAN Lancaster University DEM National Center for Scientific Research Demokritos 3 WP7 Presentation
WP7 -- Objectives according to Technical Annex Evaluation And Monitoring Project Evaluation: 1. pedagogical 2. technical WP Monitoring: 1. objective fulfillment 2. quality assessment 4 WP7 Presentation
Role of WP7 • Quality assessment • Progress monitoring and evaluation based on: • internal reports • deliverables • prototypes • additional information to be provided on WP7’s request • Proposal for changes if WP-goals are not met } =Products of WPs 5 WP7 Presentation
PM Comm. WP 7 Interfaces of WP7 coordination coordination report report alignment report WPs 6 WP7 Presentation
Evaluation and Monitoring Basis • Project Proposal Objectives (TA Section 2) • often specifies strictly and precisly measurable criteria (e.g. 2A & 4C) • sometimes lacks precision (e.g. 4A & 4B) • WP7 has task to define measurable criteria Agreement of all project partners oncriteria 7 WP7 Presentation
Y2 Y1 Procedure of Evaluation And Monitoring 01/00 01/01 01/02 01/03 1 2 3 WPs 4 5 6 time WP7 WP Milestones & Reports Evaluation Report 8 WP7 Presentation
Summary WP7 Tasks • WP7: only WP performing quality assessment • Interfaces between WP7 and all WPs, Project Management and Commission • Project and WP quality assessment: • evaluation: criteria defined in proposal (sec. 2) • monitoring: measures defined in proposal (sec. 2) • procedure: as proposed in presentation 9 WP7 Presentation
Next Steps • Preparation of interim report due 01/08/00 • Quality assessment framework • Definition of quality assessment criteria and parameters for each WP and the whole project. 10 WP7 Presentation