1 / 17

Danube Regional Multi-Hazard Model Suite Progress and Results

This update highlights the progress and results of the Danube regional multi-hazard model suite, including improved hazard mapping, completed flood models, stakeholder workshops, and communications conducted and planned.

joanak
Télécharger la présentation

Danube Regional Multi-Hazard Model Suite Progress and Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 2.1.1 Danube regional multi-hazard, multi-risk model suite Kai Schröter, Max Steinhausen, Stefan Lüdtke, Viktor Rözer, Heidi Kreibich May 7, 2019 4th H2020|Insurance project meeting, Budapest Michel Wortmann, Fred Hattermann Martin Drews, Per S. Kaspersen, Mads Dømgaard Céline Deandreis, Gwendoline Lacressonniere

  2. Outline Broad progress and results Deliverables, milestones, mid-term review Data creation and management Meetings with end-users and stakeholders Communications conducted and planned Outlook

  3. 1. Broadprogress Improved fluvial hazard model setup with 25m DEM and OSM data First hazard maps (IMAGE 10ka > SWIM > CamaFlood) Completed pluvial hazard model for Novi Sad and started for Bratislava 2nd Novi Sad stakeholder workshop and 4th Technical Review Meeting Completed Oasis-LMF compliant cat model chain

  4. Fluvial flood model improvements SWIM, CamaFlood 90m 25m • OpenStreeMap data • River central lines • River banks • Residential / industrial areas • Lakes & reservoirs

  5. EOBS-IMAGE-SWIM CamaFlood • 100-year flood hazard map

  6. OSM populated/industrial Entire catchment • 100-year flooded area, reference vs current climate period • ICHEC-KNMI – IMAGE – SWIM – CamaFlood

  7. Pluvial flood simulations Bratislava (25m DEM) Novi Sad (5m DEM) 100-year event, RP2 Sewer system 100-year rainfall event

  8. Planned WWTP Plant at RokovPotok RP100, conceptualdrainage system, infiltration Planned WWTP plant at Novi Sad

  9. WRF simulations of selectextremes Results: 15/7 2016 (61 mm) & 24/5 2015 (122 mm)

  10. 2. Deliverables, milestones, mid-term review M2.1.1.1 Risk mapping ready (M24) D2.1.1.1 OASIS LMF compliant hazard and risk mapping in the Danube basin uploaded to the OASIS-Hub (M24) – final stages Mid-term review: few changes to narrative document, contributed to updates of WP2.1.3

  11. 3. Data creation and management Updated version of the fluvial flood model (PIK servers) Started the creation of Oasis-LMF footprint files (large files, PIK servers) Novi Sad and Bratislava pluvial flood model output (DTU servers)

  12. 2nd Novi Sad Stakeholder workshop • Presentation of updated results, mainly pluvial and fluvial flooding • Highlighted fluvial flood risk at selected site • 4rd Technical Review Meeting • Mid April in Munich, organised by Genillard & Co at the AllianceRe HQ • 6-8 insurance experts, participants from WP2.1.1 and WP2.1.2 • Decided to provide full Oasis-LMF model setup for insurers to test • Valuable input from insurance modelling experts (continuing) • Series of calls with SwissRe and Generali • 4. Meetings with end-users and stakeholders • M18 - 24

  13. Presentation of the FDM to the Sava Commission (February, Zagreb) • G&co best-practice NatCat workshop (April, Munich) • Representation at the EGU (April, Vienna) • Presentation of the FDM to the International Commission for the Protection of the Danube River (ICPDR) (next week, Bucharest) • 5. Communications • M18 - 24

  14. 6. Outlook M18 - 24 • Validation of Oasis-LMF model setup with insurance partners • Fluvial model improvements and validation with input from TU Munich Interreg project (river cross sections) • Further validation using external risk maps • Papers on the setup, calibration, validation of the comprehensive models • 6th Technical Review Meeting (October 2019)

  15. Get in touch PIK Potsdam: wortmann@pik-potsdam.de, hattermann@pik-potsdam.de GFZ Potsdam: kai.schroeter@gfz-potsdam.de, max.steinhausen@gfz-potsdamd.de DTU Copenhagen: mard@dtu.dk ARIA: fvelay@aria.fr Publication: Hattermann et al. 2018. Simulation of flood hazard and risk in the Danube basin with the Future Danube Model. Climate Services. https://doi.org/10.1016/j.cliser.2018.07.001 Oasis-HUB: https://oasishub.co/organization/gfz-potsdam https://oasishub.co/organization/pik

  16. OASIS LMF enabled Exposure (Item) Area Peril Dictionary Vulnerability Dictionary Vulnerability Hazard Intensity Bin Dictionary Event Damage Bin Dictionary

  17. Generation of stochastic meteorological event sets • 4 regional climate models (CORDEX‑EU) • 2 climate scenarios (RCP-4.5 & 8.5) • Historical reference climate (1971-2000), current climate (2006-35) and two future periods (2020-49, 2070-99) 2006-2035

More Related