GLAST Program2nd Beam Test WorkshopCU IntegrationMechanical Hardware StatusNicola Saggininicola.saggini@pi.infn.it
Status – TKRs and CALs • All CU mechanical hardware is here @ INFN: • TKR Tower 8 (FLIGHT HARDWARE) • TKR Tower 16 (NON-FLIGHT HARDWARE) • CAL Module 101 (FLIGHT HARDWARE) • CAL Module 109 (FLIGHT HARDWARE) • CAL Module 119 (NON-FLIGHT HARDWARE) • All modules have passed Incoming test per SLAC procedure
Status - MGSE • All MGSE equipment here @ INFN: • 1x4 Grid • Rework Completed: • @ SLAC: TKR Mechanical Interface; Cable chaseways • @ INFN: shortening of half bays walls; Interface holes for Shipping Container/CERN cocoon
Status – MGSE (cont’d) • All MGSE equipment here @ INFN: • 1x4 Rotation Stand: • Assembled (Check of Form-Fit-Function) • Proof Tested: Proof load = 895 kg Actual Load = 716 kg (4 CALs + 2 TKR + Base Plate of ISC)
Status – MGSE (cont’d) • All MGSE equipment here @ INFN: • INFN - CAL Integration MGSE: • Assembled (Check of Form-Fit-Function) • Proof Tested: Proof load = 132 kg Actual Load = 95 kg (CAL + TEM/TPS) • Review with Project Office at SLAC/NASA held on May 3: approved!
CU Integration • What goes where: Mass Simulator (?) TKR 8 TKR 16 0 1 2 3 CAL 109 (TBD) CAL 101 (TBD) CAL 119