1 / 6

Status – TKRs and CALs

GLAST Program 2nd Beam Test Workshop CU Integration Mechanical Hardware Status Nicola Saggini nicola.saggini@pi.infn.it. Status – TKRs and CALs. All CU mechanical hardware is here @ INFN: TKR Tower 8 (FLIGHT HARDWARE) TKR Tower 16 (NON-FLIGHT HARDWARE) CAL Module 101 (FLIGHT HARDWARE)

jock
Télécharger la présentation

Status – TKRs and CALs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GLAST Program2nd Beam Test WorkshopCU IntegrationMechanical Hardware StatusNicola Saggininicola.saggini@pi.infn.it

  2. Status – TKRs and CALs • All CU mechanical hardware is here @ INFN: • TKR Tower 8 (FLIGHT HARDWARE) • TKR Tower 16 (NON-FLIGHT HARDWARE) • CAL Module 101 (FLIGHT HARDWARE) • CAL Module 109 (FLIGHT HARDWARE) • CAL Module 119 (NON-FLIGHT HARDWARE) • All modules have passed Incoming test per SLAC procedure

  3. Status - MGSE • All MGSE equipment here @ INFN: • 1x4 Grid • Rework Completed: • @ SLAC: TKR Mechanical Interface; Cable chaseways • @ INFN: shortening of half bays walls; Interface holes for Shipping Container/CERN cocoon

  4. Status – MGSE (cont’d) • All MGSE equipment here @ INFN: • 1x4 Rotation Stand: • Assembled (Check of Form-Fit-Function) • Proof Tested: Proof load = 895 kg Actual Load = 716 kg (4 CALs + 2 TKR + Base Plate of ISC)

  5. Status – MGSE (cont’d) • All MGSE equipment here @ INFN: • INFN - CAL Integration MGSE: • Assembled (Check of Form-Fit-Function) • Proof Tested: Proof load = 132 kg Actual Load = 95 kg (CAL + TEM/TPS) • Review with Project Office at SLAC/NASA held on May 3: approved!

  6. CU Integration • What goes where: Mass Simulator (?) TKR 8 TKR 16 0 1 2 3 CAL 109 (TBD) CAL 101 (TBD) CAL 119

More Related