Systemtest Status and Plans SR1 Status. R.Bates, P.Dervan, J.Pater 26 November 2003 UK-V meeting, Manchester. Performance of pre-qualification modules. 3 Pre-qualification modules on sector, replaced built-in-shunt-shield modules K5-512 in position I9 (inner, upper)

naeva
Télécharger la présentation

Systemtest Status and Plans SR1 Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Systemtest Status and PlansSR1 Status R.Bates, P.Dervan, J.Pater 26 November 2003 UK-V meeting, Manchester

  2. Performance of pre-qualification modules • 3 Pre-qualification modules on sector, replaced built-in-shunt-shield modules • K5-512 in position I9 (inner, upper) • K5-505, K5-517 in positions O8, O12 (outer, lower) • Full characterisation, noise injection performed with ground scheme variations • Without noise injection, performance does not vary with ground scheme. At Thybrid~30o: • K5-512: ~1150 electrons • K5-505: ~1650 electrons • K5-517: ~1750 electrons J.Pater - Systemtest/SR1 Status/Plans

  3. Built-in shunt-shield modules Pre-qualification modules, same ground scheme (doubleshort – Shield to DGND at PPF0 & module to cooling block) These modules seem less susceptible to pickup Injecting noise onto power tapes J.Pater - Systemtest/SR1 Status/Plans

  4. Frequency of injected noise • However, ‘new’ (?) dependence on frequency of injected noise is observed: • Peaks at 21, 30 MHz (max) have not been seen before. • NB only did a full scan once, long ago. • Fortunately no peak at 40 MHz! J.Pater - Systemtest/SR1 Status/Plans

  5. Connected Not connected Connect DGNDs together at PPF0? 30MHz max 20MHz max Overall, better performance with DGNDs connected at PPF0 but note differences in frequency response. J.Pater - Systemtest/SR1 Status/Plans

  6. AGND-pin connection + direct contact block-to-hybrid AGND-pin connection, no block-hybrid contact Module-block interface Slightly better performance with block-hybrid isolation. Again differences in frequency response. J.Pater - Systemtest/SR1 Status/Plans

  7. Thermal grease? • Slightly better performance seen if back of hybrid is isolated from the cooling block using a piece of thermally-conductive, electrically isolating fabric. • Grease applied to blocks for these three modules, and resistance AGND-block measured. Two modules showed ~ 0-0.5Ω, the third showed infinite resistance i.e. open. • Injection not yet performed on this configuration. J.Pater - Systemtest/SR1 Status/Plans

  8. Change in opto-receiver response • PIN diodes in OPTIF modules have thresholds  windows of good operation. • This window used to be very narrow, now is much wider. • Change seemed to come with change from old wiggly tapes (wide, Al traces) to new (narrow, Cu traces + piggyback wires). NB old tapes had separate vled0/vled1 lines, new tapes supply vleds in parallel with one line. • This change should be understood. Intend to put some old tapes back on sector and investigate. J.Pater - Systemtest/SR1 Status/Plans

  9. Plans • Finish injections on current sector configuration (test effect of thermal grease). • Add more modules (3 more outers available), side-by-side. Inject noise, see if pickup worse with more modules. • Investigate change in opto-receiver threshold window. • Install and test new PPF1s and PP3s: • Requires old Cu tapes (running from PP1 to PP2) to be replaced with TypeII cables, have enough of these for 6 modules but need to attach PPF1-end connectors. • Test redundancy links • Links have Samtec connectors, modules have Specialties. Options, in order of preference: • Get a couple of production modules • Get some redundancy links made with Specialties (won’t provide a good test of mechanical properties of final-version links) • Use Specialty-Samtec adaptors (even worse mechanical test, maybe not even good electrical test.) J.Pater - Systemtest/SR1 Status/Plans

  10. SR1 • Currently barrel sector is installed in SR1, to be used to build test-area DAQ (currently being worked on in B161). • RODs etc. for assembly-area (endcap acceptance testing) DAQ are expected in March, at which time the endcap sector will move to SR1 and be used to commission this system. J.Pater - Systemtest/SR1 Status/Plans