An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRMIS3 Status and Plans Gabriele Carcassi 10/11/2010

  2. IRMIS3 modules

  3. Infrastructure • Requirements • Build/packaging – production • Logging – production • Security (AuthZ/AuthN) – prototype • TBD • Improve logging • Not covered • Nothing that we are aware • Available in the distribution with general support • Maintainer: Gabriele Carcassi

  4. Component module • Requirements • Ability to edit component types – production • Ability to edit components (installations) in hierarchy – production • TBD • Final UI touches • Not covered • Nothing that we are aware • Available in the distribution with general support • Maintainer: Gabriele Carcassi

  5. Cabling module • Requirements • Ability to edit cable types – production • Ability to edit cable tray/partition/paths – production • Ability to edit cables – production • TBD • Load test (missing data) • UI consolidation • Not covered • Nothing that we are aware • Available in the distribution with general support • Maintainer: Gabriele Carcassi

  6. Lightweight inventory module • Requirements • Ability to track parts – production • Ability to install/uninstall parts – production • TBD • Installation/uninstallation history – will export to the eLog • Not covered • Shipping and receiving – not planned • Components lifecycle – not planned • Travelers – not planned • Available in the distribution with general support • Maintainer: Gabriele Carcassi

  7. eLog module • Requirements • Data model – prototype • UI – prototype • API – nothing • TBD • Requirement verification and implementation • Not covered • Not available • Maintainer: Don Dohan

  8. Lattice module • Requirements • Data model – prototype • PVAccess service/API – prototype • TBD • Requirement verification and implementation • Not covered • Multiple lattices using different “as-built” parameters • Not available • Maintainer: Don Dohan • Old version available in the distribution as is • Maintainer: Gabriele Carcassi

  9. Save restore module • Requirements • Data model – prototype • PVAccess service/API – prototype • TBD • Requirement verification and implementation • Not covered • Not available • Maintainer: Don Dohan

  10. Magnetic measurement module • Requirements • Data model – prototype • TBD • Requirement verification and implementation • Not covered • Not available • Maintainer: Don Dohan

  11. PV Crawler module • Requirements • PV Crawler – production in IRMIS2 • API – alpha • UI – nothing • TBD • Test and bundle the crawler with IRMIS3, finalize API and implement UI • Not covered • Nothing that we are aware • Not available • Maintainer: ?

  12. EPICS db generation module • Requirements • Channel description for component types – prototype • Control hierarchy can be mined to guide/validate db • ? • TBD • ?? • Not covered • ??? • Not available • Maintainer: ????