AMBER Case Study

AMBER Case Study Buffalo Creek, CO 13July1996 Buffalo Creek (1) #1020 13July1996 9.5mi 2 Sand Draw #5050 13July1996 1.5mi 2 Spring Gulch #5051 13July1996 1.0mi 2 Buffalo Creek Z/R Gage WSR-88D estimate was 2.75 inches. Rain gage report was 2.68 inches.

johana
Télécharger la présentation

AMBER Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMBER Case Study Buffalo Creek, CO 13July1996

  2. Buffalo Creek (1) #1020 13July1996 9.5mi2

  3. Sand Draw #505013July1996 1.5mi2

  4. Spring Gulch #505113July1996 1.0mi2

  5. Buffalo Creek Z/R Gage • WSR-88D estimate was 2.75 inches. • Rain gage report was 2.68 inches. • WSR-88D estimate would be available in real time. • Rain gage is located at 234.5o at 76.5km from the Denver WSR-88D.

  6. Buffalo Creek,CO #404313July1996 0.5mi2

  7. Conclusions • Heavy 1 hour burst of rainfall was concentrated over the fire scar. • Almost all of the observed ABR went into runoff, due to the state of the ground. • The rainfall across the Buffalo Creek watershed was concentrated near the mouth, leading to a rapid sharp rise in the creek.