Fairfax County Public Schools Energy Management VEPGA 7/11/08. Kirk Hiles, PE - Energy Engineer kirk.hiles@fcps.edu Tom Reinsel, PE CEM Coordinator, Energy Management tom.reinsel@fcps.edu. Fairfax County Public Schools. Fairfax County population – 1,041,200
E N D
Fairfax County Public Schools Energy Management VEPGA 7/11/08 Kirk Hiles, PE - Energy Engineer kirk.hiles@fcps.edu Tom Reinsel, PE CEM Coordinator, Energy Management tom.reinsel@fcps.edu
Fairfax County Public Schools • Fairfax County population – 1,041,200 • About 1 out of 7 Virginians live in Fairfax County • 12th largest school district in USA • 164,843 students • 22,234 employees • 236 Schools and Centers • 25 Million s.f. of buildings
Utility Budget FY08 • Electricity Budget $28.7 million • Gas/oil $11.4 million $40.1 million - total electric and gas budget
Energy Management Section • Coordinator • 2 Energy Management System Specialist • 1 Shop Supervisor • 3 EMS Technicians • 2 Mechanical/Controls Engineers • 1 Inspector 10 positions total
Control Systems Andover 102 Automated Logic 19 American Automatrix 16 Carrier 12 Delta 4 Honeywell 1 Invensys/BarberColmen/Seibe 33 Novar 1 Powers 7 Siemens 1 Trane 13 Tridium 32 (most integrated with other systems) Proliphix web thermostats -307 in modulars +/- 242 systems
Controls Replacements 23 DDC controls projects are in some stage of construction from planning/design to final punch out/warranty. Replacement done through: • Design and Construction new or renovated buildings • Infrastructure Engineering –Replacement • Energy Management – upgrades/replacements/modifications • ESCO – New or replacements
Energy Performance Contract/ ESCO • 106 Buildings • 10,453,683 Square Feet • $19,313,572 investment • $2,470,448 estimated annual savings • 7.8 year simple payback Preliminary work/feasibility/RFP began 2001 Construction started 1/2003 - Completion August 2006 Contract is “turn key” design build. FCPS dedicated no full time project manager. Part of coordinator time plus 1-1/2 inspectors. ESCO provides design.auditing engineers and project management resources. Up to 4 full time PMs at times. Most work occurs and is managed at night.
Energy Performance Contract/ ESCO • T-12 to T-8 • MH to T-5 in gyms • Incandescent to compact fluorescent • All new LED exit signs – no conversion kits • Occupancy sensors • No de-lamping or reducing light output! • Watch product selection carefully…
Energy Performance Contract/ ESCO Other Projects in Contract: • Window upgrades • Tridium Integration with legacy EMS • EMS installs and replacements • Automated Meter Reading • Boiler Tune-ups • Pneumatic Tune ups • Boiler Conversions (electric to gas) • Trailer Controls - Bard controllers • Chiller monitoring (Carrier)
Other Stuff • Energy Watchdog for bill tracking • Energy Management Web Portal • EKA automated meter reading upgrade to server • US EPA Energy Star Portfolio/ • SchoolDude/FSDirect scheduler • Modular building web base thermostat upgrade • Training program for HVAC and Operating Engineers • Reverse auction for gas via Washington Council of Governments COG • Migration to “web based” 632 EMS devices with IP address - had one device in 2003. • Migration to graphical/web interfaces - 147 graphical systems – had one in 2003
New stuff in the pipeline…. • New Construction is being designed to Collaborative for High Performance Schools (CHPS) standards. Emphasizes energy use (lighting and HVAC) more than LEED ( NOT doing LEED) • Geothermal heat pumps - evaluating now – expect to start using them soon. • PJM Demand response program pilot in 5 schools • Switching 2 schools from VEPGA 130 to 132 schedule as pilot. • Formal internal energy audits of schools by engineer with improvement tracking.