1 / 13

Fairfax County Public Schools Energy Management VEPGA 7/11/08

Fairfax County Public Schools Energy Management VEPGA 7/11/08. Kirk Hiles, PE - Energy Engineer kirk.hiles@fcps.edu Tom Reinsel, PE CEM Coordinator, Energy Management tom.reinsel@fcps.edu. Fairfax County Public Schools. Fairfax County population – 1,041,200

johana
Télécharger la présentation

Fairfax County Public Schools Energy Management VEPGA 7/11/08

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fairfax County Public Schools Energy Management VEPGA 7/11/08 Kirk Hiles, PE - Energy Engineer kirk.hiles@fcps.edu Tom Reinsel, PE CEM Coordinator, Energy Management tom.reinsel@fcps.edu

  2. Fairfax County Public Schools • Fairfax County population – 1,041,200 • About 1 out of 7 Virginians live in Fairfax County • 12th largest school district in USA • 164,843 students • 22,234 employees • 236 Schools and Centers • 25 Million s.f. of buildings

  3. Utility Budget FY08 • Electricity Budget $28.7 million • Gas/oil $11.4 million $40.1 million - total electric and gas budget

  4. Energy Management Section • Coordinator • 2 Energy Management System Specialist • 1 Shop Supervisor • 3 EMS Technicians • 2 Mechanical/Controls Engineers • 1 Inspector 10 positions total

  5. Control Systems Andover 102 Automated Logic 19 American Automatrix 16 Carrier 12 Delta 4 Honeywell 1 Invensys/BarberColmen/Seibe 33 Novar 1 Powers 7 Siemens 1 Trane 13 Tridium 32 (most integrated with other systems) Proliphix web thermostats -307 in modulars +/- 242 systems

  6. Controls Replacements 23 DDC controls projects are in some stage of construction from planning/design to final punch out/warranty. Replacement done through: • Design and Construction new or renovated buildings • Infrastructure Engineering –Replacement • Energy Management – upgrades/replacements/modifications • ESCO – New or replacements

  7. Energy Performance Contract/ ESCO • 106 Buildings • 10,453,683 Square Feet • $19,313,572 investment • $2,470,448 estimated annual savings • 7.8 year simple payback Preliminary work/feasibility/RFP began 2001 Construction started 1/2003 - Completion August 2006 Contract is “turn key” design build. FCPS dedicated no full time project manager. Part of coordinator time plus 1-1/2 inspectors. ESCO provides design.auditing engineers and project management resources. Up to 4 full time PMs at times. Most work occurs and is managed at night.

  8. Energy Performance Contract/ ESCO • T-12 to T-8 • MH to T-5 in gyms • Incandescent to compact fluorescent • All new LED exit signs – no conversion kits • Occupancy sensors • No de-lamping or reducing light output! • Watch product selection carefully…

  9. Energy Performance Contract/ ESCO Other Projects in Contract: • Window upgrades • Tridium Integration with legacy EMS • EMS installs and replacements • Automated Meter Reading • Boiler Tune-ups • Pneumatic Tune ups • Boiler Conversions (electric to gas) • Trailer Controls - Bard controllers • Chiller monitoring (Carrier)

  10. Other Stuff • Energy Watchdog for bill tracking • Energy Management Web Portal • EKA automated meter reading upgrade to server • US EPA Energy Star Portfolio/ • SchoolDude/FSDirect scheduler • Modular building web base thermostat upgrade • Training program for HVAC and Operating Engineers • Reverse auction for gas via Washington Council of Governments COG • Migration to “web based” 632 EMS devices with IP address - had one device in 2003. • Migration to graphical/web interfaces - 147 graphical systems – had one in 2003

  11. New stuff in the pipeline…. • New Construction is being designed to Collaborative for High Performance Schools (CHPS) standards. Emphasizes energy use (lighting and HVAC) more than LEED ( NOT doing LEED) • Geothermal heat pumps - evaluating now – expect to start using them soon. • PJM Demand response program pilot in 5 schools • Switching 2 schools from VEPGA 130 to 132 schedule as pilot. • Formal internal energy audits of schools by engineer with improvement tracking.

  12. Fairfax County Public Schools Energy Management Kirk Hiles, PE - Energy Engineerkirk.hiles@fcps.edu Tom Reinsel, PE CEM Coordinator, Energy Management tom.reinsel@fcps.edu

More Related