This presentation outlines the ME 4000 project undertaken by the SMA Array Controls Team, highlighting key elements such as the project schedule, budget, and benchmarking of critical components. It details milestones including the Critical Function Prototype due on November 8th, thermocouple attachment by December 9th, and the thermal recycling system prototype by February 9th. Various sensors like linear potentiometers and LVDTs are evaluated for their benefits and drawbacks. The team members and advisor are also presented for contact reference.
E N D
SMA Array Controls Team Team Members Clifton Christensen ccchristensen84@hotmail.com Andrew Ige andrew.ige@utah.edu Jason Lindstrom jason.lindstrom@utah.edu Advisor Dr. Stephen Mascaro smascaro@mech.utah.edu SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Presentation Outline • Schedule • Budget • Benchmarking • Critical Function Prototype SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Schedule • Current Progress • Key Dates • Nov.8th : Critical Function Prototype • Dec.9th : Thermocouple Attachment Prototype • Feb.9th : Thermal Recycling System Prototype • Apr.10th : Project Completion SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Budget • Spending • Current • Projected • Funding • College of Engineering: $50/Person/Semester • Dr. Mascaro: DC Power Supply SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Benchmarking Linear Potentiometer • Pros • Simplicity • Linear Output • Cons • Size Model RD7121 Linear Potentiometer ALPS Electric SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Benchmarking Linear Variable Displacement Transducer (LVDT) • Pros • Linear Output • Cons • Size • Cost Model 500 DC-SE LVDT Schaevitz Sensors SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Benchmarking Model FLDK 110C1003/S42 (Laser) Photoelectric • Pros • Non-Contact • Resolution • Cons • Size • Cost Baumer Electric Ltd. SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Critical Function Prototype (CFP) SMA Displacement Sensor Inline Encoder SMA Muscle SMA Muscle ~3mm ~3mm LED Photodetector Tendon Connection Fluid Outlet LED Photodetector Varying Distance Equally Spaced Black Lines Casing Both Pictures Generated By Clifton Christensen SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Summary • Schedule • Budget • Benchmarking • Critical Function Prototype (CFP) SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06
Contact Information Team Members Clifton Christensen ccchristensen84@hotmail.com Andrew Ige andrew.ige@utah.edu Jason Lindstrom jason.lindstrom@utah.edu Advisor Dr. Stephen Mascaro smascaro@mech.utah.edu SMA Array Controls Team: ME 4000 Project Introduction Presentation 10-25-06