Resource Adequacy for Distributed Generation . January 27, 2012 10:15 am to 12 noon Energy Division staff discussion Megha Lakhchaura. Distributed Generation at the CPUC. These programs include the Feed-in-tariff authorized under PU Code 399.20 (up to 1.5 MW)

Resource Adequacy for Distributed Generation - slide 1
01 / 13Resource Adequacy for Distributed Generation
1 / 17

Télécharger la présentation

Resource Adequacy for Distributed Generation
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Resource Adequacy for Distributed Generation January 27, 2012 10:15 am to 12 noon Energy Division staff discussion Megha Lakhchaura

  2. Distributed Generation at the CPUC • These programs include the • Feed-in-tariff authorized under PU Code 399.20 (up to 1.5 MW) • Renewable auction mechanism (up to 20 MW) • CHP feed-in tariff under AB 1613 (up to 20 MW) • Investor-owned utility solar photovoltaic (PV) Programs (1-20 MW) • Other generating resources connected at the distribution level

  3. Defining Discussion • Roadmap to assign RA to DG • Not Immediate. Depends on CAISO’s timeline for deliverability study • Follows publication of CAISO study results and adoption of allocation method in CPUC proceeding • Pro-active attempt to estimate the scope of the project before project goes too far • Workshop today is not to discuss the technical aspects of the CAISO study but foresee potential issues after allocation

  4. CAISO Straw Proposal • New annual assessment methodology for determining and allocating RA deliverability for DG resources • Deliverability for distribution interconnected generation available to LRA under a process similar to how RA import capacity is allocated.

  5. Allocation to LRAs When the study is completed the ISO will provide a list of the network nodes modeled in the study and the corresponding MW amounts of deliverable DG for each node.

  6. Allocation • CPUC does not have a specific proposal • Goal – Brainstorm and identify issues with allocation process

  7. Potential Options • CPUC can administer programs so LSEs are directed to build facilities only at nodes that have residual deliverability. • CPUC can allocate deliverability to LSES and LSES can administer their own contracting pursuant to verification by CPUC staff.

  8. Which Programs Qualify ? Options • Projects approved under current CPUC DG programs • Projects that connect through Rule 21 and WDAT • Should there be a potential mix of various DG programs to fulfill various legislative mandates? • Do all DG programs pay for RA ?

  9. Tracking Managing deliverability at the node • Monitoring the projects at each node • Mapping of the nodes • Project viability for each DG project • Transfer of deliverability at the nodes between projects and between LSEs • Directing projects to nodes with residual deliverability • Who should manage projects at the nodes?

  10. RA credit How will LSEs get RA credit for distributed generation ? • Individual qualifying capacity of resources • Development of NQC list that includes all DG projects • Resources like CHP which have customer side consumption as well as net export to distribution grid

  11. When should RA credit be allocated to a project • Gestation of a DG project • How long does a project take to come online? • At what stage should the deliverability be allocated to the project? • What are the milestones that can be used to determine the progress of a project ? • How to determine QC given lack of performance data and lack of clarity about native use.

  12. Timing • Timing of the CAISO’s • Tariff filing with FERC would synchronize with the CPUC’s RA proceeding.

  13. Thank you! For Additional Information: http://www.cpuc.ca.gov/PUC/energy/ Megha Lakhchaura Procurement and Resource Adequacy Phone: (415) 703-1186 Email: meghalakhchaura@cpuc.ca.gov