Microelectronics Clean Room Electrical and Computer Engineering
190 likes | 209 Vues
Learn about orbital tube welding process, equipment setup, tube preparation, operation, weld schedules, safety measures, and evaluation. Comprehensive guide by Clayton Gatewood.
Microelectronics Clean Room Electrical and Computer Engineering
E N D
Presentation Transcript
Microelectronics Clean RoomElectrical and Computer Engineering Orbital Tube Welder by Clayton Gatewood
Overview • General Information • Safety • Set-up • Tube Preparation: facing, cleaning • Operation • Weld Schedules • Weld Evaluation by Clayton Gatewood
Orbital Tube Welding • Gas Tungsten Arc Welding (GTAW) process • Fusion Welding • Model 8 Weld Head • Model 207A Power Supply • Argon Gas Cylinder • Facing Tool • ARC Machines, Inc. by Clayton Gatewood
Gas Tungsten Arc Welding (GTAW) Process • Used to weld tubing that remains in-place while the tungsten electrode rotates around the target joint. • Material edges are heated by an arc and are fused together without a filler. by Clayton Gatewood
Safety • Electricity Hazard: Shock, RF Starting, Pacemaker, Electric Storage Devices • Fire Hazard: Clothing, Sealed Containers, Welded Material Hot to Touch • Harmful UV Radiation (eyes and skin) • Toxic Fumes from Welding Stainless Steel, Hexavalent Chromium (lung cancer) • Air Displacement by Argon Gas • Factory Training Essential • Keep Hands and Fingers Clear • Compressed Gas Cylinders • Cleaning Chemicals by Clayton Gatewood
Set-Up • Ensure Power is Off • Connections: Weld Head, Argon Gas, main power cord • Apply Argon (¼ turn) @ 20 psi by Clayton Gatewood
Tube Preparation • Facing by Clayton Gatewood
Welding Cleanliness • Materials to be welded must be free of grease, oil, rust, dirt, paint and other contaminants. • Dirty materials can result in porosity, discoloration, slag deposits, and generally poor quality welds. by Clayton Gatewood
Operation • Align target joint with tungsten electrode • Connect Argon Purge Line and set for 5 psi (for ¼” OD tubing) • Select Weld Schedule • Ensure Power Supply is “Ready to Weld” • Press “Seq Start” • Prepurge, Weld, Downslope, Postpurge by Clayton Gatewood
Weld Schedule Development • An orbital tube weld may be done in 4 or more levels. • It must include enough time for tie-in before the downslope. by Clayton Gatewood
Weld Schedules • Pre / Post Purge Time • Up / Downslope • Rotation Direction • Rotation Delay • Pulse Mode • Rotation Mode • RPM (Rotor Travel Speed) • Level Times • Level Amps • Background Amps • Pulse Times by Clayton Gatewood
Power Supply Sequence by Clayton Gatewood
Sample Weld Schedules by Clayton Gatewood
Weld Evaluation • 60 to 80% overlap on outer diameter • Poor rotation delay • Borescope to inspect inner diameter • Full penetration • No cracks, undercut, crevices, pits, or embedded or protruding material by Clayton Gatewood
Weld Profiles by Clayton Gatewood
Weld Defects by Clayton Gatewood
Argon Purge and Oxygen • Left to Right = effect of increasing levels of oxygen in the argon purge by Clayton Gatewood
Possibilities … by Clayton Gatewood
Works Cited "MODEL 207 Operator Training Guidelines." Arc Machines, Inc.CD-ROM.Pacoima, CA: Arc Machines, Inc., 2007. Model 207 Microprocessor-Controlled Power Supply.1 Nov. 1996. Arc Machines, Inc.. 16 Oct. 2007.<http://www.arcmachines.com/prodMed/m207ps/m207ps.html>. by Clayton Gatewood