1 / 8

Modification Proposal Mod_11_12

Modification Proposal Mod_11_12. Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012. Agenda. Proposed Modification Compressed Air Energy Storage Unworkable Options. Proposed Modification.

kaiyo
Télécharger la présentation

Modification Proposal Mod_11_12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modification ProposalMod_11_12 Gaelectric Energy Storage Presentation to Modifications Committee 29/05/2012

  2. Agenda • Proposed Modification • Compressed Air Energy Storage • Unworkable Options

  3. Proposed Modification To extend the definition of Special Units in the Trading and Settlement Code to include Compressed Air Energy Storage. Current Definition: “means a Generator Unit or Supplier Unit that is subject to special treatment in accordance with the rules for Special Units set out in Section 5. The Units concerned are Interconnector Units, Energy Limited Generator Units, Pumped Storage Units, Autoproducer Units, Generator Units Under Test and Demand Side Units.” Aim: To work with SEMO, TSOs & RAs to come to an equitable position for CAES in the T&SC as a Special Unit.

  4. In conjunction with… “However other forms of storage such as compressed air storage are becoming available and the rewards and value to the system of system level storage needs to be reviewed. To this end the SEM Committee will request that the TSOs undertake a review covering payments for system wide storage and provide recommendations to the SEM Committee.” Demand Side Vision 2020 Decision Paper (SEM-10-052)

  5. Agenda • Proposed Modification • Compressed Air Energy Storage • Unworkable Options

  6. CAES Technology Electricity Input Electricity Output Compression Train Generation Train Gas Input Well Head Storage Cavern

  7. Agenda • Proposed Modification • Compressed Air Energy Storage • Unworkable Options

  8. Unworkable Options • Pumped Storage: • TOD= Pumped Storage Cycle Efficiency (PSCEut) • CAES is dual fuel (each consumed at different times); Resulting in two efficiency metrics. • CAES must account for variable cost of Natural Gas • Demand Side Units • Demand Site shall house final customer • CAES Demand Site is not a final customer • Generated Electricity >De Minimis • Energy Limited Generators • Proposed CAES plant has ability to generate as and when required and is not therefore subject to a physical energy limit on its store.

More Related