1 / 2

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas EMC

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas EMC PM#06 Mainz – 18/19 July 2006. EMC The preliminary EMC Control Plan has been completed and has been distributed to Consortium Members for comments before delivery to ESO

kalare
Télécharger la présentation

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas EMC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas • EMC • PM#06 Mainz – 18/19 July 2006

  2. EMC • The preliminary EMC Control Plan has been completed and has been distributed to Consortium Members for comments before delivery to ESO • An EMC Spec has been prepared, based on ESO EMC requirements, in order to complete the Lower Level Specs issued by EIE and has been distributed to Consortium Members for comments. The aim is to support procurement activities and allow a proper traceability of ESO EMC requirements verification before delivery to ESO • The EMC Control Plan is based on prototype data available at AAS-I complemented with the information extracted from the presentations done at various PMs. The document will be updated as soon as the electrical design will be frozen.

More Related