130 likes | 260 Vues
British Petroleum (BP) is experiencing unprecedented growth in its Gulf of Mexico (GoM) Deepwater Production business, which includes a portfolio of 8 major assets. With the launch of 5 new platforms in just three years, this sector will account for 15% of BP's global production, reaching approximately 500 mboe/day. BP faces challenges such as subsurface complexity and high-pressure environments, necessitating advanced real-time monitoring and collaboration. Innovations like the Advanced Collaborative Environment (ACE) and real-time data architecture are integral for enhancing operational efficiency, safety, and reserve recovery while driving continuous improvement in business processes.
E N D
Customer CasesPI in Oil & Gas British Petroleum
BP’s Gulf of Mexico Business GoM Deepwater Production Business Unit • Portfolio of 8 DWP GoM assets • Unprecedented growth and complexity • 5 new platforms in 3 years • Will represent 15% of BP’s global production at ~500 mboe/day
Business Challenge Horn Mountain Thunder Horse Marlin Holstein Mad Dog NaKika Atlantis • Subsurface Complexity • High Pressure, High Temperature • More Sub-sea High Current Operations
Onshore Remote Operations Support • Replicated Offshore Data(Read-Only) • 24/7 Video Conferencing • Real-Time Monitoring: • Topsides • Marine • Subsea • Drilling Advanced Collaborative Environment
Real Time Data • Drilling Visualization • Rotating Equipment • Real Time Drilling • One Touch • Topsides Monitoring • ISIS • Integrated Marine Monitoring • Process Net • AWS (Subsea) • Fiber Optic Network • Subsea/Well Surveillance • Riser/Mooring Data
Benefits • Systems vendors now support our assets from the Advanced Collaborative Environment (ACE) • Control systems support is in the ACE versus staffed offshore • Solve operational problems faster • Identify and solve allocation errors more quickly • Support more assets with fewer resources • Our work efficiency is at an all-time high • Our integrity management has driven our HSSE incidents to all time lows • Our reserve recovery and production have exceeded our past technical limits • Our production efficiency is industry recognized as best in class
Summary • Real time data architecture and infrastructure enables collaboration across the enterprise • PI System has been proven to be reliable and scalable, and able to grow with our needs. • We have made significant improvements in our business by having visibility of real time information throughout our operating group • We no longer consider this a project – • This is now a key component in our continuous improvement journey • It is integral to the future success of our business.