1 / 3

Test Plan/FHC Flow Chart

Test Plan/FHC Flow Chart. Current Typical DESKES FHC/Test Plan (TP) Recommendation Process. Service Developer. * The Flow Chart Below is Based on Using the HC Module in DESKES.

kamea
Télécharger la présentation

Test Plan/FHC Flow Chart

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test Plan/FHC Flow Chart

  2. Current Typical DESKES FHC/Test Plan (TP) Recommendation Process Service Developer * The Flow Chart Below is Based on Using the HC Module in DESKES The Service Hazard Classifiers will advise the Chairman, DDESB within 30 days of receiving a FHC of their concurrence or non-concurrence. Failure to reply within 30 days indicates concurrence. The Chairman, DDESB will resolve non-concurrence. For hazard classification by the Not New or the 49 CFR 173.56(h) methods, Service Hazard Classifiers concurrence is not required. Service Lead Developer The Service Hazard Classifier will forward a proposed testplan to the JHC for review, revision and approval.The other Service Hazard Classifiers will advise Chairman, DDESB within 45 days of receiving the test plan of their input. Failure to reply within 45 days indicates concurrence. The Chairman, DDESB, will issue an approval letter. Developer forward/sends to Lead Developer Service Classifier Lead Developer forward/sends to Classifier to finalize Service HC position JHC Remaining Services review/modify through the collaboration screen in DESKES and approve/send concurrence positions to DDESB Classifier reviews/modifies and approve/sends to Joint Hazard Classifiers (JHC) DDESB For “test plans,” DDESB signs approval memo, forwards to Services and attaches a copy to the DESKES record.

  3. Current DESKES FHC Approval Process (Cont) SDDC – The Surface Deployment and Distribution Command had established in a previous agreement as the single point of contact between DoDand DOT USATCES – The US Army Technical Center for Explosives Safety maintains the DoD AE HC data in the JHCS and control of database access JHC - The Joint Hazard Classifiers are comprised of members from the Army, Navy , Air Force and DDESB JHCS – The Joint Hazard Classification System is the official DOD database of final hazard classification data for the military services' ammunition and explosives DDESB SDDC USATCES DOT SDDC Safety Net creates record and forwards to DOT automatically Nightly, DOT automatically “files” by creating a record and providing a letter assigning EX number back through SDDC to DESKES/JHCS In parallel, DOT’s EX letter is emailed upon generation to the Army hazard classifier The Army hazard classifier conducts final review, adds any additional data and makes it a production record in the JHCS

More Related