An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Development Process (PDP) Structures

  2. PDP – Three Project Levels • Major Project ~ 14 Steps • Minor Project ~ 10 Steps • Minimal Project ~ 5 Steps

  3. PDP - Major Project Level • Major Investment Study • New interchange • Multiple alternatives • Corridor type projects • Large amounts of ROW • Highway on new location

  4. 0

  5. Major PDP ~ Step 1

  6. Major PDP ~ Step 2

  7. Major PDP ~ Steps 3, 4 & 5

  8. Major PDP ~ Step 6

  9. Major PDP ~ Step 7 1 Projects with non-standard railing types, non-redundant designs and fracture critical members require OSE approval 2 Prefabricated structure types require OSE approval

  10. Major PDP ~ Step 8

  11. Major PDP ~ Step 9 3Projects with non-redundant designs & fracture critical members require OSE approval 4Projects with special designs for prefabricated structure types require OSE approval

  12. Major PDP ~ Step 10

  13. Major PDP ~ Step 11

  14. Major PDP ~ Steps 12, 13 & 14

  15. PDP - Minor Project Level • Bridge replacements, resurfacing (with drainage), and safety projects • Projects may include ROW, utility relocations

  16. Minor PDP ~ Step 1

  17. Minor PDP ~ Step 2

  18. Minor PDP ~ Step 3 1 Projects with non-standard railing types, non-redundant designs and fracture critical members require OSE approval 2 Prefabricated structure types require OSE approval

  19. Minor PDP ~ Step 4

  20. Minor PDP ~ Step 5 3Projects with non-redundant designs and fracture critical members require OSE approval 4Projects with special designs for prefabricated structure types require OSE approval

  21. Minor PDP ~ Step 6

  22. Minor PDP ~ Step 7

  23. Minor PDP ~ Steps 8, 9 & 10

  24. PDP - Minimal Project Level • Minor rehabilitation projects that do not alter highway cross section or geometry • No ROW • Minimal impacts to utilities • No impacts to environmental resources Examples: bridge painting, deck overlays, scupper installations, barrier facings, concrete sealing, partial depth repairs, etc…

  25. Minimal PDP ~ Step 1

  26. Minimal PDP ~ Step 2

  27. Minimal PDP ~ Steps 3, 4 & 5

  28. Questions?