FAB

Entry 3. Entry 2. Entry 1. Continuous Miner. Continuous Miner. T-4. Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm. Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm. D. D. Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm. Shop. Haul Truck. 1 set of Building

Télécharger la présentation

FAB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Entry 3 Entry 2 Entry 1 Continuous Miner Continuous Miner T-4 Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm D D Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm Shop Haul Truck 1 set of Building Material 2 Timbers 2 Timbers XXXXXXXXXXXXXX Caved Impassable Caved Tight Lunch Room Foreman's Jeep XXXXXXXXXXXXXX XXXXXXXXXXXXXX Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm B-1 B-3 B-2 Check Curtain B-4 Bob E. X XXXXXXXXXXXXXX X X X X X X X X X C Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm B PC Maintenance truck Unsafe Roof Scalable Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm Unsafe Roof Scalable (all X’s in outlined area) Bear E. Haul Truck W/bed up On Fire. 4160 v Cable arcing and on fire 1 set of building material Low Roof Light Smoke O2 = 18.0 % CO = 1195 ppm NO2 = 18 ppm Mine Fan ON/OFF Light Smoke O2 = 16.5 % CO = 1250 ppm NO2 = 21 ppm Check Curtain Man-trip Ron E. D C Water Ankle Deep Grizzly Fire hose X Sump pump Bill E. FAB Water Valve (OFF) #3 (Intake) #1 (exhaust) N #2 (Intake) Heavy Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm PROBLEM MAP

  2. Entry 3 Entry 2 Entry 1 25 58 57 28 24 56 D D 26 59 29 27 23 60 30 31 55 22 32 54 16 15 13 14 19 51 12 35 33 50 52 53 18 36 20 11 17 49 34 21 10 9 48 8 7 5 40 39 6 43 37 38 4 47 44 45 3 41 Placard Map 2 46 1 42

  3. Entry 3 Entry 2 Entry 1 D D WING CURTAIN C Heavy Smo D C #3 (Intake) #1 (exhaust) N #2 (Intake) VENTILATION MAP

  4. Entry 3 Entry 2 Entry 1 D D #3 (Intake) #1 (exhaust) N #2 (Intake) Ventilation Map

  5. Entry 3 Entry 2 Entry 1 D D #3 (Intake) #1 (exhaust) N #2 (Intake) Team Map

  6. Entry 3 Entry 2 Entry 1 D D #3 (Intake) #1 (exhaust) N #2 (Intake) Fresh Air Base Map

  7. Entry 3 Entry 2 Entry 1 D D #3 (Intake) #1 (exhaust) N #2 (Intake) Co-Captain’s Map

  8. Entry 3 Entry 2 Entry 1 D D C C #3 (Intake) #1 (exhaust) N #2 (Intake) Judges’ Map

  9. Entry 3 Entry 2 Entry 1 20’ x 10’ pillar 20’ x 10’ pillar 10’ entries & 10’ crosscuts D D 20’ x 20’ pillar 20’ x 20’ pillar 10’ entries & 10’ crosscuts 20’ x 20’ pillar 20’ x 20’ pillar 10’ entries & 10’ crosscuts N Construction Map