Electronic Bag Toss Progress Report Presentation

DESCRIPTION

Electronic Bag Toss Progress Report Presentation. Group Members: Tim W illiams Richard Deward Advisors: Professor Miller Professor Nattu Senior Design Winter 2012. Project Design Overview. Design Objective To create a fully a utomated bag toss scoring system Design Components

1 / 14

Télécharger la présentation

Electronic Bag Toss Progress Report Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electronic Bag TossProgress Report Presentation Group Members: Tim Williams Richard Deward Advisors: Professor Miller Professor Nattu Senior Design Winter 2012

  2. Project DesignOverview • Design Objective • To create a fully automated bag toss scoring system • Design Components • Microcontroller • Wireless communication between boards • Bag Toss scoring algorithm • Bag placement sensors for all possible locations • User Interface • Score Display

  3. Design Requirements • Hit or Miss • Bags in or on board • Bags that miss completely • Team Identification • Alternating throws • Bag Displacement • Bags that fall off no longer count

  4. Score Tracking • Main Issues: Missed Bags, Team Differentiation • Option 1: Weight Sensors • Potential Problems: Accuracy, Robustness • Option 2: Image Processing • Potential Problems: Camera location • Option 3: RFID Tags • Potential Problems: Antenna Range, Tag Collision

  5. RFID Reader SM130 13.56 MHz Parallax 125 kHz Serial

  6. Motion Sensor • Passive Infrared Sensor (PIR) • Power range 5 – 12V • Range of up 20ft

  7. Bags that Miss • Display (Score/Timer) • LCD Screen • LED • 2. Pushbuttons • Score Correction • Game Speed

  8. Sound FX/ Power Options • Sound Effect Options • WAV/AD4 SD Card Audio Player Module • Power • Plug into Outlet • Rechargeable Battery

  9. Wireless Communication • ZigbeeXbee Starter Kit • 300ft Range • Zigbee802.15.4 wireless communication

  10. Work Division • Richard Deward • Antenna Design/Calibration • Wireless Communication • Power Circuit • Sound FX • Tag to Bag Integration • Hardware Construction • Tim Williams • RFID Reader Setup • PIR Integration • Scoring Algorithm • Scoring Display • User Interface • Turns Timer

  11. Specifications • Scaled Down Version of ACA standards for Demo Purposes: • 20 1/8” L x 10 ½” W x 1 ½” D • Bags: 2 ½ x 2 ½ ” • Playing distance 10 – 14ft

  12. Standards • Zigbee XBEE Wireless Communication Kit • IEEE Standard 802.15.4 • C Programing language • Mifare Standard (ISO/IEC 14443 Type A contactless smartcard) • Engineering Ethics

  13. Schedule

  14. Questions?