kaveri
Uploaded by
16 SLIDES
381 VUES
160LIKES

Overview Presentation on Luminis Platform

DESCRIPTION

Overview Presentation on Luminis Platform. This presentation is taken from a much longer one by SungardHE It shows the main elements of a portal and has references to the implementation plan and its timeline.

1 / 16

Télécharger la présentation

Overview Presentation on Luminis Platform

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview Presentation on Luminis Platform • This presentation is taken from a much longer one by SungardHE • It shows the main elements of a portal and has references to the implementation plan and its timeline. • “Portal” is the generic term for this type of application. SungardHE calls its Portal “Luminis”. For our purposes, the two names are interchangeable. • The Portal has a login, and based on the person’s login, will present customized and interactive pages. • The Content is targeted to your specific role(s) as well as the specific groups you may belong to. • We expect to start with Alumni, Student, Faculty, and staff portals; more roles will be added as quickly as we can deploy them. More specific roles would include:

  2. Partial list of RolesAll of these would be available upon completion in 2009 • Alumni • Faculty & Student (General Undergraduate) • Graduate Student (Each School) • First Year Student (upon receipt of deposit) • Applicant (upon submission of application) • Parent • Prospective Student (Each School) • Staff (deployed incrementally parallel to Banner. Please see the separate Banner Channels presentation for more details)

  3. Integrating SSO with Third Party Systems One of our primary goals is to integrate Single Sign On with as many Third Party Applications as possible. Here is a partial list: • Alumni Social Networking Application • Blackboard • Intelliworks (iRM) • Libraries (Bistro, Sirsi, …?) • Lotus Notes • Mirapoint (Student Email) • R25 calendar • Right Now Technologies (Faq)

  4. Luminis features & functionality: Login page

  5. Pre-built Luminis channels Please see the separate Banner Channels presentation for more details Please see the separate Banner Channels presentation for more details

  6. Luminis features & functionality: Portal with channelized content Please see the separate Banner Channels presentation for more details

  7. Luminis Channels for Banner 7.x(Advancement) Please see the separate Banner Channels presentation for more details

  8. Luminis Channels for Banner 7.x(Financial Aid) Please see the separate Banner Channels presentation for more details

  9. Luminis Channels for Banner 7.x(Finance) Please see the separate Banner Channels presentation for more details

  10. Luminis Channels for Banner 7.x(HR) Please see the separate Banner Channels presentation for more details

  11. Luminis features & functionality: Course schedule

  12. Luminis features & functionality: calendar

  13. Luminis Platform functionality:Online group homepage

  14. Project Milestones • The Portal project is, in essence, a web presentation layer which parallels the Banner deployment. As a new Banner module is deployed, its functionality will be accessed via the Portal. • Though we are working to make the Portal as complete an experience as possible, until Banner Student goes live in Fall 2008, students will not fully benefit from the Banner channels. We will make as much other content available as we can in the mean time.

  15. Complete Project Timeline

  16. Project Resources • You may find more general information on the Confirmare project at: http://www.fordham.edu/confirmare At: http://www.fordham.edu/portal • You will find a presentation specifically on Banner Channels for the Portal. • Links to other institutions’ portal sites with guest logins. • A feedback form to submit your comments on the information we have provided.

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer