An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Energy UpdateOctober 6, 2012

  2. OG&E’s Commitment to Wind Energy (2007) • Make Oklahoma a national leader in renewable energy • Mission Accomplished! • Quadrupled OG&E’s wind power capacity by 2012 • Increased transmission capacity to enable OG&E and others to deliver wind-generated power from western Oklahoma to load centers • Provided OG&E communities and customers choice of being up to 100% “green power” users • Responsible development model: Executed first two MOA’s with Wildlife Department to offset wildlife habitat impacts.

  3. OG&E’s Renewable Efforts….. • 50 MW “Sooner” wind farm • 120 MW “Centennial” wind farm • 101 MW “OU Spirit” wind farm • 130 MW “Taloga” wind farm • 150 MW “Keenan” wind farm • 227 MW “Crossroads” wind farm • 60 MW “Blackwell” wind farm Note: Orange denotes OG&E owned wind projects. Total of 840 MW installed by EOY 2012! 10% of annual energy produced

  4. Why Does OG&E want Wind? Helps to keep our electric prices low by offering: Fuel Hedge Emission Hedge Our Customers’ want WIND Contributed to diversification of rural income streams

  5. (To Rose Hill) (To Kansas) Cleveland Sooner (OG&E) Woodward (OG&E) Hitchland OG&E Transmission Expansion: 345kV Projects Muskogee (OG&E) OG&E Projects Windspeed Non-OG&E Ownership Seminole (OG&E) 2012 Potential Build Anadarko (OG&E) Sunnyside (OG&E) Hugo Tuco OG&E earned right to build ~ $1.5 Billion in new 345kV EHV transmission

  6. Site Plan

  7. Map of Crossroads(Over 40,000 acres)

  8. Wind Turbine Overview

  9. Power Curves for Two Different Turbines

  10. Power Equation • Can’t change air density • Can work with Area (blade length) • Can work with Velocity (tower heights, blade design) P=1/2 p x A x V3

  11. Turbine Characteristics Turbine 389 ft Overall height Football field 360 ft (Including end zones) Statue of Liberty 375 ft Nacelle mounting height 80 M (262 ft) Centennial Blade diameter 77 M (253 ft) OU Spirit Blade diameter 93 M (306 feet) Crossroad Wind diameter 101M (328 feet)

  12. Turbine Characteristics with 80 meter towers 101 Meter Blades Height 428 feet 93 Meter Blades Height 415 feet 77 Meter Blades Height 389 feet Swept Area +46% Swept Area +72%

  13. Current Technology – CrossroadsSiemens SWT 2.3 101 • Rated 2.3 MW • Cut-in wind speed 8.95 mph • Rated wind speed 26.84 mph • Cut-out wind speed 55.92 mph • Tower height 80 m. • Rotor diameter 101 m.

  14. Next Gen Technology - CrossroadsSiemens SWT 3.0 101 • Rated 3.0 MW • Same specs as the 2.3-101, but with 50% fewer moving parts. • No gearbox, uses a direct drive system. • OG&E first to install this model in the U.S.

  15. Wind is Energy, Not Capacity

  16. Questions & Discussion