1 / 18

Closing Remarks

Closing Remarks. Robert Schweiss. Road Less Traveled Meetings … Where to from here? Where to from here … Schedule Issues as captured during meeting… Conclusion. Agenda. Road Less Traveled. Sept 5, ‘07 CERES Study WG Meeting. SDS impacts submitted, Sept 15.

keilah
Télécharger la présentation

Closing Remarks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Closing Remarks Robert Schweiss

  2. Road Less Traveled Meetings … Where to from here? Where to from here … Schedule Issues as captured during meeting… Conclusion Agenda

  3. Road Less Traveled • Sept 5, ‘07 CERES Study WG Meeting. SDS impacts submitted, Sept 15. • Jan 15th, 2008 DPMC, approved adding CERES FM5 to NPP Mission • Jan 16th, 2008 EXCOM concurred • Feb 28th, 2008 SDS NPP CERES Presentation at LaRC • SDS kick off • June 11th, IDPS F2F, Denver Colorado • July CERES TIM @ GSFC • AI ‘s assigned • Aug 26th Land PEATE, SD3E, and CERES CARS dCDR @ GSFC

  4. Meetings, Meetings, Meetings • IDPS Quarterly Face-to-Face meetings • IDPS Major Milestones • BAR, CDW, H/W Decision, etc. • DFWG (Data Format Working Group) • EIWG (External Interfaces Working Group) • NSIPS to SDS I/F Meeting • NIWG (NPP Integration Working Group) • NGST’s ERB (Engineering Review Board) • NGST ARB (Algorithms Review Board) • IPO’s CCB (Configuration Control Board) • UC/NCF Customer Forum Quarterly Meetings • NPP I&T Working Group Meeting

  5. Documentation Landscape • From NOAA • NOAA CLASS to User Community IRD • From NPP Project Office • Mission Data Format Control Book • NPP System Integration and Test Plan • NPP Mission Operations Management Plan • NPP Mission Requirements Specification • From Various Sources (VOAT, O3OAT etc) • ATBD Documents • From IPO/NGST et al • EDR-IR, EDR-PR, OAD, • From IPO/NGST • NPOESS to SDS ICD • NPOESS to NOAA ICD • NPOESS CDFCB Volume 1 Overview • NPOESS CDFCB Volume 2 RDR Format • NPOESS CDFCB Volume 3 SDR & TDR Format • NPOESS CDFCB Volume 4 (Parts 1- 4) EDR Format • NPOESS CDFCB Volume 5 Metadata • NPOESS CDFCB Volume 6 Ancillary Data Messages, & Reports • NPOESS CDFCB Volume 7 Data formats for the NPOESS application packets • NPOESS Common Interfaces and Services ICD • NPOESS Internal DFCB Volume III – Retained Intermediate Product Formats

  6. Where to from here? • Coordinate, Support, Leverage Testing • Functional Threads Tests • Mission Event Planning & Scheduling (FTT1A/B) • Command Processing (FTT2A/B) • Flight Vehicle Software Change / Load (FTT3) • Telemetry Processing (FTT4A/B) • Mission Administrative Info Handling (FTT5) • Ingest SMD, RDR Generation and Routing (FTT6A/B) • SDR & EDR Generation and Routing (FTT7) • SDS Data Ingest (FTT8) • SDS Radiometric Assessment (FTT9) • SDS Geometric Characterization (FTT10) • SDS Calibration Activities (FTT12) • User Query, Order and Product Distribution (FTT 14) • Encryption Key Checkout (FTT 15A/B, 16) • HRD – APID Selection (FTT 19) • Orbit Maintenance (FTT 21) • Safe-Hold Autonomous Fail-Safe Occur. & Recovery (FTT 22) • Anomaly Detection & Reaction (FTT 23) • NPP Ground System Activation (FTT 24)

  7. Where to from here? • Generate a CCR to update requirements • Integrate a schedule • Prioritize Issues and develop work off plans. • Peer MOR (Aug 27-28, 2008) • MOR (November 2008) • Mission readiness assessment review • NCT 3 (June ‘09) • Execute nominal mission data handling propagating data through the ground system with all 4 flight sensors on board the satellite and after installation of the ground system on-site (72 Hrs.) • NCT 4 (TBD) • Exercises mission configuration, 3 days in the mission life with all elements of ground segment. Real-time telemetry and SMD may be played back from local storage at the Svalbard station to C3S and IDPS using the operational links.

  8. Schedule • April 21, 2005 NPP SDS SRR • March 2005 NPP SD3E Prototype started • August 2005 NPP PRE MOR • September 2005 NPP SD3E Hardware Buy Build 1 • November 2005 NPP SD3E Hardware Build 1 Installation • November 2 Peer Review (SD3E & Ozone PEATE) • November 9 Peer Review (NICSE) • November 30 Peer Review (Ocean & Land PEATE) • Spring 2006 NPP SDS Build 1 • September 19, 2006 NPP SDS PDR • April 10, 2007 Atmosphere PEATE PDR • June 19, 2007 Sounder PEATE PDR • July 18, 2007 Peer Review SD3E, Ocean,Land,Ozone,I&TSE • Sept 14, 2007 NICSE Peer Review • October 31 - Nov 1 NPP SDS CDR • December 2007 SDS Release 2 • August 2008 dCDR CERES Data • September 2008 Sounder & Atmosphere PEATE CDR (TBD) • Launch -12 Operations Personnel on board • March 2008 Mission Operations Review • April 2009 Operations Readiness Review • July 2009 Mission Readiness Review • September 30, 2009 Launch Readiness Date (LRD)

  9. Need 28hrs of RDR data fall ‘08 Oct -Nov W/o this data systems may not be ready for NCT3 Not clear who was writing/describing some “unique” data products e.g., VIIRS resample SDRs A table of products, formats, and documentation source is needed. Xtalk issue may need to be revisited as related to to choosing I1 over M5 Coordinate build schedule plans w/ NPP Project SI&T as related GS Freeze It was not clear whether or not the build 3 schedule was acceptable with NPP SI&T. Issues As Captured

  10. SDS Schedule (1 or 3)

  11. SDS Schedule (2 or 3)

  12. SDS Schedule (3 or 3)

  13. Closing Remarks • NPP SDS is a research tool for NPP EDR Evaluation • Supports the NPP Science Team • NPP SDS PEATE is implemented through leveraging off existing resources • For Example: Ocean Color Data Processing, MODAPS, & OMI/TOMS • NPP SDS Elements Land Ocean and SD3E and now CERES CARS can support handling CERES data for the NPP Mission. • Reminder: Panel Members are requested to disposition RFAs immediately after the meeting

  14. Acronyms

  15. Ao Operational Availability ADS Archive and Distribution Segment ADP Ancillary Data Providers AFWA Air Force Weather Agency Anal. Analysis ANSI American National Standards Institute ATBD Algorithm Theoretical Basis Document ATMS Advanced Technology Microwave Sounder BB Black Body BRDF Bidirectional Reflectance Distribution Function BTDF Bidirectional Transmissive Distribution Function C3S Command, Control and Communications Segment CARS Climate Analysis and Research Service CCB Configuration Control Board CCS Climate Calibration Service CDMS Climate Data Management Service CDPs Climate Data Products CDRs Climate Data Records CLASS Comprehensive Large Array-data Stewardship System CM Configuration Management CMS Climate Mission Storage COTS Commercial Off-the-Shelf CrIS Cross-Track Infrared Sounder DCAVS Distributed CDR/EDR Algorithm Validation Service DDR Data Delivery Report DEM Digital Elevation Model Demo. Demonstration DFD Data Flow Diagram DN Delivery Notification DoD Department of Defense DQM Data Quality Management EDRs Environmental Data Records EDU Engineering Development Units EOS Earth Observing System EOSDIS Earth Observing System Data and Information System ESE Earth Sciences Enterprise GSFC Goddard Space Flight Center I&TSE Integration and Test System Element ICD Interface Control Document IDPS Interface Data Processing Segment Insp. Inspection IP Intermediate Products IPO Integrated Program Office IRD Interface Requirements Document ISF Integrated Support Facility IT Information Technology JPL Jet Propulsion Laboratory LEO&A Launch, Early Orbit, and Activation LRD Launch Readiness Date Acronyms

  16. LSS Launch Support Segment LTA Long Term Archive LUT Look-up Tables MDT Mean Down Time MODIS Moderate Resolution Imaging Spectrometer MODAPS MODIS Data Processing System MRS Mission Operations Concept MTBDE Mean Time Between Downing Events N/A Not Applicable NASA National Aeronautics and Space Administration NESDIS National Environmental Satellite, Data, and Information Service NEXT NPP EDU eXchange Toolkit NGST Northrop Grumman Space & Mission Systems Corp. Space Technology NICSE NPP Instrument Calibration and Support Element No. Number NOAA National Oceanic and Atmospheric Administration NPOESS National Polar-orbiting Operational Environmental Satellite System NPP NPOESS Preparatory Project NWP Numerical Weather Prediction OMPS Ozone Mapper/Profiler Suite OSHA Occupational Safety and Health Administration PDR Product Subscription Request PEATE Product Evaluation and Analysis Tool Element POS Performance and Operations Specification POSIX Portable Operating System Interface for Computer Environments PSOE Project Science Office Element PST Project Science Team RDRs Raw Data Records RSB Reflective Solar Band RSR Relative Spectral Response RVS Response Versus Scan Angle SD Solar Diffuser SD3E Science Data Distribution and Depository SDRs Sensor Data Records SDS Science Data Segment SDSM Solar Diffuser Stability Monitor SER Scientific, Engineering and Research SI&T System Integration and Test SRD Sensor Requirements Document ST Science Team TBD To Be Determined TBR To Be Resolved TBS To Be Supplied TDR Temperature Data Record TEB Thermal Emissive Band TEUs Telemetry in Engineering Units TV Thermal Vac UTC Universal Time Coordinate VIIRS Visible Infrared Imager Radiometer Suite VDD Version Description Document xDRs RDR, EDR, SDR, and TDR Acronyms

  17. SDS Level 1 Requirements(Outdated)

  18. SDS Level 1 Requirements

More Related