An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2001 Power Cost Adjustment Mechanism • Nine-month mechanism because of 10/01/01 effective date for new tariffs under PGE restructuring rate case • Baseline negotiated, based loosely on 1997 rates and 2001 overall forecasted test year; assumed average water • All changes from baseline tracked • purchases • sales • fuel • Speculative wholesale trading excluded – PGE “tags” speculative trades • Ability to change base rates within the nine months if there is a significant underlying movement in the market • No earnings test because of dead-band and sharing tiers • All major parties stipulated to mechanism 56

  2. $ 232.5 $ 211.1 $ 175.9 $ 140.7 $ 119.3 Power Cost Adjustment Mechanism ($ in millions) • Power Costs $260.5PCA $(35.9) 90/10 Sharing Tier 50/50 Sharing Tier Deadband: PGE has100% of risks and rewards 50/50 Sharing Tier 90/10 Sharing Tier Budgeted9 Month Regulated Power Costs For Illustration purposes only. Not drawn to scale, 57

  3. PGE’s Restructuring Filing – UE 115 • On 10/2/00, we filed both an integrated and an unbundled case • Test year is 2002, with new rates to take effect 10/1/01(initial 15 months) • Case proceeds regardless of start date for direct access • All non-power cost issues settled with OPUC Staff except ROE • Achieved excellent settlement - 96% of filed cost of service for these areas • Some customer groups are contesting some of the settled issues but PGE is confident that the settlement will hold • Power cost issues settled as of June 12 with OPUC Staff, ICNU, and CUB. Baseline power cost to be set in late August. • ROE • PGE filed rebuttal on May 20 and early June hearings went well for PGE • Settlement remains possible 58

  4. Restructuring Filing - Power Cost Settlement • Basic mechanism is similar to 2001 mechanism • Tiers of sharing, with less sharing as the variance between forecasted power costs and actual power costs is larger, positive or negative • Mechanism runs for 15 months: from October 1, 2001 to December 31, 2002 • New Features • Quarterly amortization of any accrued balances • Forecasted power costs set using actual reservoir levels and expected rainfall, significantly reducing forecasted available hydro • Changes in energy revenues included in the equation • Catastrophic plant losses trigger a change in forecasted power costs and are outside the mechanism • PGE will file the forecasted power costs on or around August 15, reflecting trades and purchases through the end of July 60

  5. Power Cost Adjustment Mechanism ($ in millions) 95/5 Sharing Tier +$200 90/10 Sharing Tier +$100 85/15 Sharing Tier +$38 50/50 Sharing Tier +$28 Deadband: PGE has100% of risks and rewards 15-month baseline power cost* -$28 50/50 Sharing Tier -$38 85/15 Sharing Tier -$100 90/10 Sharing Tier -$200 95/5 Sharing Tier *To be determined in August/September 61