kenyon-bray
Uploaded by
24 SLIDES
439 VUES
240LIKES

(Pre-) Master programme 2014-2015

DESCRIPTION

(Pre-) Master programme 2014-2015. Communication Studies 26 August 2014. Programme today. Staff members Communication Studies. Pre-master Programme. The pre-master’s ( compulsary ) courses are : Communication Science (192470410) (5 EC)

1 / 24

Download Presentation
Télécharger la présentation

(Pre-) Master programme 2014-2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (Pre-) Master programme 2014-2015 Communication Studies 26 August 2014

  2. Programme today

  3. Staff members Communication Studies

  4. Pre-master Programme The pre-master’s (compulsary) courses are: • Communication Science(192470410) (5 EC) • AcademicWriting CS (201400328) (5 EC) • Research Meth. andDesc. Stat. (201300063) (5 EC) • Communication Research and Design (201300065) (5 EC) • InferentialStatistics(201300064) (5 EC) • Research Project (201300066) (5 EC)

  5. Pre-master programme 14/15

  6. Registration Form Pre-master CS Before you will start in the pre-master CS you have to fill in the registration form and hand in in to the study counsellor You can find this (registration) form on the (pre-master CS)website: http://www.utwente.nl/cw/pre-master/ Important: Whenyoustudyfull-time we stronglyadviceyouto do all the courses in one semester! Youonlywillbeadmittedto the master at the moment you have completedyou pre-master CS completely.

  7. Rules in the Pre-master CS Programme • The pre-master’s programmeis (a full-time) programme of 30 EC (1 semester on the basis of 40 hours of study a week). • All pre-Master’s courses must be successfully completed before you can enroll in the Master programme CS. • The maximum registration period for completing the pre-master’s programme is 1 year. During this period you may maximal sit 2 times for an exam. If you pass the second time for one ore more exams you will be excluded from the pre-master’s programme CS. • Obligatory prior knowledge to start with the course Research Project Communication Science, Research Meth & Des. Statistics at least grade 5 AND Academic Writing at least grade 6!

  8. Master Communication Studies (CS) • One year study programme 60 EC (by full time study) • The master programme has the followingspecialisations: Marketing Communication Corporate Communication Media and Communication Technical Communication • Youcan start with the master’sprogramme in September or February

  9. MASTER PROGRAMME (60 EC) (1) Before starting with the master’s programme you have to choose between 1 out of 4 specialisations . For the specialisation Marketing, CorporateandMedia and Communication the generic study trajectory looks as follows: • Compulsary course (10 EC) - Core courses of the chosen specialisation (10 EC) (Offered twice a year, each semester) - at least two specialisations courses of the chosen specialisation (10 EC) → (offered once a year) • Specialisation or elective courses from another specialisation (10 EC) • Master thesis (30 EC).

  10. MASTER PROGRAMME (60 EC) (2) For the spec. Tech. Communication the study trajectory look as follows: • Obligatory courses (25 EC): - Core courses of the chosen specialisation (10 EC) - User Support (5 EC) - Philosophy of Technology (5 EC - Authoring and Colloboration Tools (5 EC) • (At least) One of the following courses (at least 5 EC): - Designing Learning & Performance Support - Human Computer Interaction - User Centered Design of New Media • Master thesis (30 EC).

  11. MASTER PROGRAMME (60 EC) (3) Programme Guide master Communications Studies 2014/2015: http://www.utwente.nl/cw/master/ Before you will start in the master CS you have to fill in the registration form master CS and hand in in to the study counsellor. You can find this (registration) form on the (master CS)website: http://www.utwente.nl/cw/master/

  12. Digital Systems UT (Osiris, Black Board, My Timetable etc.) • Individual student account to get access to UT applications → you received a letter with studentnumber and password • If you (still) did not receive this information, you can go to: →Student Services Desk (Vrijhof): for your studentnumber →ICTS Service Desk (Citadel, ground floor): for your Password (bring your student number and personal ID with you!) “HOW TO USE THESE SYSTEMS?” Look into Powerpoint presentation: http://www.utwente.nl/onderwijssystemen/en/about_the_applications/new_students/

  13. Is used for: • Announcements • Looking up college sheets / interesting articles etc. • Looking up assignments and handing them in • Checking (partial) grades • Forming groups for assignments • The saving of shared documents Black board Onderwijssystemen UT

  14. Via the Student Portal of directly: http://blackboard.utwente.nl Log in with your student account Blackboard Logging in Onderwijssystemen UT

  15. Is used for • Study counselling • Enrolment and un-enrolment for exams • Checking recent study results • An overview of the study progress • Checking information about the content of all courses OSIRIS Onderwijssystemen UT

  16. Via Studentenportal or http://osiris.utwente.nl/student OSIRIS Logging in Onderwijssystemen UT

  17. In case any questions about UT Educational systems remain… • Please go to the UT Educational systems support / questions meeting on: Monday 1 September 12.30 – 13.45h (= lunch hour) Location: Cubicus, B209 • Or in case of ICT or admissionproblems, go to: - HelpdeskICT Service (ICTS) ( http://www.utwente.nl/icts/) Citaldel, ground floor (8.30 – 17.00) - Student Services ( http://www.utwente.nl/ces/studentservices/en/ ) Vrijhof, 239B (10.00 – 16.00)

  18. Roster/schedule Roster/time schedule pre-master and master CS: https://rooster.utwente.nl/ You can compose your personal timetable for all the courses you will be taking. You can export this timetable to your own agenda on your smartphone. Any changes in the timetable will be sent to your smartphone within 15 minutes.

  19. Academic calender Academic calender 2014-2015: http://www.utwente.nl/ces/planning-roosters/en/academic-calendar/academic-calendars/UT%20Academic%20calendar%202014-2015%20%20for%20MSc%20students%20%2B%20BSc%20students%20started%20before%20or%20in%202012.pdf

  20. Enrollment courses and exams • Always bring your account and password with you to practicals! • Registering for (written) exams is obligatory for all exams!! • To take part in educational activities, you will have to enrol in Osiris for courses. By enrolling for a course, you are enrolled for both educational activities as the first chance of the corresponding test/exam. Registering for (written) exams is obligatory for all exams! • Always bring your student card with you to each exam

  21. All important links canbe found in the Student Portal (My University) Do notforget to register for (all) courses (in OSIRIS) Exam enrolment in Osiris (no enrolment = no exam) Ifyou are enrolledfor a course in Osiris you are alsoenrolledforthis course in Black Board • http://www.utwente.nl/cs all information about the (pre)master CS • We only correspond with you through your STUDENT e-mail account Summary (of important Notes) Onderwijssystemen UT

  22. Important information for international students • Walk-in hour for consultation Faculty’s Coordinator Internationalization: Ms. Monique Davids Building Cubicus, room C107 • Tuesday 26 August: 15.00hrs – 17.00hrs • Thursday 28 August: 15.00hrs – 17.00hrs • Friday 29 August: 15.00hrs – 17.00hrs • In case you want to organize a meeting with the Faculty’s Coordinator Internationalization outside of these time slots, please make an appointment by sending an e-mail to m.davids@utwente.nl • Wednesday 27 August: Acculturation program Location: CU B209 Time: 10.00 – 12.00hrs

  23. One thing to say………….. Have a verystudiousandpleasant time at the University of Twente andparticulary in our CS programme!! We wishyou a fantastic student life and make sure youenjoyit!!

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer