Project 14361: Engineering Applications Lab

DESCRIPTION

Project 14361: Engineering Applications Lab. Agenda. Team Introduction Meeting Purpose Problem Background Problem Statement and Deliverables Stakeholders Use Scenarios Prioritized List of Needs Engineering Requirements Risk Management Possible Ideas Draft of Project Plan

1 / 16

Télécharger la présentation

Project 14361: Engineering Applications Lab

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Project 14361: Engineering Applications Lab

  2. Agenda • Team Introduction • Meeting Purpose • Problem Background • Problem Statement and Deliverables • Stakeholders • Use Scenarios • Prioritized List of Needs • Engineering Requirements • Risk Management • Possible Ideas • Draft of Project Plan • Questions?

  3. Team Members Jennifer Leone: Project Leader, Dirk Thur: Mechanical Engineer Industrial Engineer Larry Hoffman: Electrical EngineerCorey Gillsepie:Electrical Engineer Angel Herrera:Electrical EngineerThomas Gomes: Electrical Engineer SalehZeidan:Mechanical EngineerHenry Almiron: Mechanical Engineer

  4. Meeting Purpose • Update customer on current progress of the project • Looking for feedback from all stakeholders • Want to make sure team and customer are on the same page with needs and requirements

  5. Problem Background • Students in the Mechanical Engineering department currently take a sequence of experimental courses, one of which is MECE – 301 Engineering Applications Lab. • GOAL: a common lecture period for all sections, and then a weekly, simpler experiments that students will also run independently.

  6. Problem Statement and Deliverables • The purpose of this senior design project is to design and produce a number of laboratory modules that will eventually be used in the engineering course MECE – 301 Engineering Applications Lab • Three to four modules used to provide a set of advanced investigative scenarios that will be simulated by theoretical and/or computational methods.

  7. Stakeholders MSD Team RIT Professors & Faculty RIT Engineering Students

  8. Use Scenarios • In the lab students will analyze a module which inspire an experiment which will include a theoretical, and experimental analysis of the module. • After completing this experiment, the students should have a firmer grasp on basic engineering principles and processes.

  9. Prioritized List of Needs • Requests 3 modules at minimum; 4 or 5 are preferred • Modules may be of different technical challenge and complexity • All modules must emphasize practical engineering experiences. • Each module should be interesting to the students • Modules should bridge applications areas, such as electromechanical or electrochemical • All modules should use commercially-off-the-shelf equipment to enable maintenance and sustainability of module use over many semesters of student enjoyment • At least one module should have analysis challenges that are at or beyond student learning from core coursework

  10. Prioritized List of Needs Continued • All modules should be able to: • Fully configured, utilized, and returned by student engineers • Stand alone; contain everything they need without borrowing from other sources • Have a high level of flexibility and expansion allowing for many engineering opportunities • Be robust and safe

  11. Engineering Requirements • To Be Determined when Modules are Chosen • Each Module will have own Engineering Requirements

  12. Risk Management

  13. Draft of the Project Plan

  14. Possible Ideas • Mass-Spring dampener system (Data Acquisition/Dynamics/Differential Equations) • Cooling System for Electrical System (Heat Transfer/Circuits) Windmill • http://www.instructables.com/id/Making-a-Desktop-Case-Fan/ • Hydraulic Lifting Arm/Complete Trust/ Bridge • (Fluids/Dynamics) • Hand Charged Flashlight • Inverted Pendulum • Plane Engine/Propeller thrust • Vibrating Plate/ Chladniplate • http://www.youtube.com/watch?v=lRFysSAxWxI • Low Tem Sterling Differential Engine • http://www.youtube.com/watch?v=B2rD-3FYnz0

  15. Looking Forward to Week 6… • Continue Researching, Brainstorming and conducting interviews with stakeholders for more information • Solidify Customer Needs and Engineering Requirements • Identify Risks Associated with each module • Chosen 5 or 6 modules we hope to work on • Begin drawings and design modules

  16. Questions?

More Related