1 / 47

W504 – Asbestos removal – Case studies

W504 – Asbestos removal – Case studies. Case study 1 – Asbestos rope removal – gas production platform. Removal of asbestos rope insulation from pipework on gas production platform Asbestos content of rope – contains approximately 95 – 100% chrysotile Comment on procedures adopted.

Télécharger la présentation

W504 – Asbestos removal – Case studies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. W504 – Asbestos removal – Case studies

  2. Case study 1 – Asbestos rope removal – gas production platform • Removal of asbestos rope insulation from pipework on gas production platform • Asbestos content of rope – contains approximately 95 – 100% chrysotile • Comment on procedures adopted

  3. Case study 2 – Removal of asbestos insulating board riser panels • Removal of asbestos insulating board riser duct panels from block of flats in London • Asbestos content of insulating board – approximately 20% amosite • Comment on procedures adopted

  4. Removal of asbestos insulating board ceiling panels • Asbestos insulating board panels (contain approximately 20% amosite) to be removed from a school site • How would you expect the work to be undertaken? • Consider the following: • Work program • Removal techniques • Controls to prevent spread of asbestos • Decontamination procedures • Clearance certification • Any other issues

  5. Removal of asbestos insulation from under floor duct • Asbestos sectional pipe insulation (contains approximately 40% chrysotile) to be removed from a hospital site • How would you expect the work to be undertaken? • Consider the following: • Work program • Removal techniques • Controls to prevent spread of asbestos • Decontamination procedures • Clearance certification • Health and safety issues • Any other issues

  6. Removal of asbestos spray coating, asbestos insulating board and asbestos cement sheeting • Asbestos spray coating to high level beams (contains approximately 90% amosite) • Asbestos insulating board panels as internal wall panels (contains approximately 20% amosite) • Asbestos cement external sheet (contains approximately 10% chrysotile) • All above to be removed from a large warehouse • How would you expect the work to be undertaken? Consider the following: • Work program • Removal techniques • Controls to prevent spread of asbestos • Decontamination procedures • Clearance certification • Any other issues

More Related