An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transport and Handling (T&H) considerations for HL-LHC I. Ruehl – CERN / EN-HE Standards and Best Practices Workshop CERN 13thJune2014

  2. Outline • General issues • Surface T&H • Surface → LHC underground transfer • LHC underground T&H • Your input • Conclusion HL-LHC Standards and Best Practices Workshop

  3. General Issues Need to consider all phases • Delivery of components • Assembly • Test • Storage • Transfer to shaft • Lowering (crane or lift ?) • Loading underground • Transport along tunnel (co activities) • Unloading / Transfer onto supports • Removal for repair Integration • Space for transport, unloading and transfer / installation • Allow for guidance error margin • Allow co-activity (passage next to transport zone) • Space for loading lowered items • Consider logistics (parking and passing places) • Integrate T&H requirements into equipment and infrastructure design as early as possible – saves time and money; avoids conflicts & increases SAFETY!!! HL-LHC Standards and Best Practices Workshop

  4. General Issues – Space → INTEGRATION! HL-LHC Standards and Best Practices Workshop

  5. Road transports • ≤ 44 tons • Dimensions: 25 m length x 4m wide (incl. truck and trailer) • (second category – permanent authorization for CERN during LHC construction) • >44t ≤ 55 tons • Dimensions upon limitation of roads and local infrastructure • (third category – special request/authorization) • > 55 tons • Dimensions as for ≤ 55 tons • need specialized company • (third category – special request/authorization) HL-LHC Standards and Best Practices Workshop

  6. Road / Surface T&H equipment Mobile crane 220t • Cranes: • 2 mobile cranes for loads up to 220t (30t at 100m deep) • 1 pick and carry crane  16t • Telescopic forklift  12t • Straddle carrier 37t • 345 EOT cranes up to 280t • Forklifts: • 25 diesel forklift up to 6t • 1 diesel diesel  12t • 13 electrical forklifts up to 4t • Trailers, MEWP etc. Mobile crane 55t Pick & carry 16t Straddle carrier 37t Forklift - Diesel Forklift - Electrical MEWP HL-LHC Standards and Best Practices Workshop

  7. Surface – LHC underground transfer: Cranes PM45 PX54 PM65 PX45 PX65 PM25 PX85 PX25 PM85 PMI2 PX15 PMI5 HL-LHC Standards and Best Practices Workshop

  8. Surface – LHC underground transfer: Cranes Figure shows list of cranes by point withcapacity and ‘horizontal’loaddimension. Maximum dimensions canbeincreased on case by case study. Standard shaft zone HL-LHC Standards and Best Practices Workshop

  9. Surface – LHC underground transfer: Cranes Example of technical spec: PR719 80T SX6-PX65-UX65 HL-LHC Standards and Best Practices Workshop

  10. Surface – LHC underground transfer: PM shafts HL-LHC Standards and Best Practices Workshop

  11. Surface – LHC underground transfer: Lifts HL-LHC Standards and Best Practices Workshop

  12. LHC underground T&H Volume reserved for transport HL-LHC Standards and Best Practices Workshop

  13. LHC underground T&H: Standard solutions Pefra Fenwick-Linde 6t Trans-Lift 2.5t Volk 30t Mafi 20t Mobilev 2t HL-LHC Standards and Best Practices Workshop

  14. LHC underground T&H: Specific solutions LHC cryo-magnet T&H equipment • Advantages • Allows installation with very limited clearance (250 to 300 mm) underneath the cryo-module • Transfer tables allow small longitudinal corrections during resp. after lateral movement • Disadvantages • Very sophisticated, complex and consequently maintenance intensive • Tunnel almost entirely blocked during transport operation LHC ‘warm’ magnet T&H equipment • Advantages • All-in-one solution for longitudinal transport and lateral transfer • No longitudinal offset when wheels turn 180° • Operates on slopes up to 7% • Operator friendly • Disadvantages • Require considerable clearance (>500 mm) underneath the machine components • Requires exact positioning since jacks can only compensate for a very slight misalignment • Tunnel almost entirely blocked during transport operation HL-LHC Standards and Best Practices Workshop

  15. LHC underground T&H: Cryo-magnets Courtesy K. Artoss • MCTU (LSS and dipoles) • Removable support points (3) Lateral distance: 432, 530, 630 mm LHCHMUMV0042 and 43 3 trailer types : CTU, MCTU, STU

  16. LHC underground T&H: Specific solutions Courtesy JL. Grenard • Trailer-Crane unit for remote handling of Collimators 1t • Collimators designed with automatic service connections • Integrated mechanical guiding system Boom collision detection Power connected to the monorail Motorized lifting spreader Shielding at each extremity Side collision detection Recovery manual hydraulic control

  17. Your inputT&H studyspecificationsheet • Equipment description / characteristics / drawings / specifications indicating: • Length / Width / Height • Weight • Support / Fix point(s) • Lifting point(s) • Center of gravity • Maximum acceleration limits • Vibration limits • Temperature limits • Natural frequencies • Quantities to be transported & installed • Additional equipment weight & dimension if required for transport e.g. spreader beam • Interconnection details • Cross section drawing of equipment in tunnel • … HL-LHC Standards and Best Practices Workshop

  18. Conclusion • Available T&H means at CERN covers some (most?) of HL-LHC requirements BUT • new cryo-magnet layout/dimensions may require a complete new set of equipment for T&H operations • inner triplet (a.o.) replacements needs in-depth studies • We need your input to define our WPs • integrate T&H requirements into equipment and infrastructure design as early as possible • Smart design solutions /layouts to be applied whenever possible and in particular when remote handling becomes necessary (radiation level; ALARA principle) → see presentation by K. Kershaw • Please provide a certified spreader / lifting beam with your supply HL-LHC Standards and Best Practices Workshop

  19. Contacts For more details, questions etc. please contact either or HL-LHC Standards and Best Practices Workshop

  20. ¿QUESTIONS? HL-LHC Standards and Best Practices Workshop