Satellite Data Verification Group Status Check

Tracking the progress of Level 2 algorithm verification activities, IPF/F-PAC upgrades, and ESLs interfaces during Commissioning Phase. Includes milestones, readiness reviews, and tool developments.

kimi
Télécharger la présentation

Satellite Data Verification Group Status Check

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RA-2/MWR Level 2 algorithms verification and products validation group status • Level 2 group activities time schedule • IPF/F-PAC upgrade time schedule • ESLs/PDS interfaces during Commissioning Phase • ESLs/IPF readiness status • Conclusions

  2. Level 2 group activities time schedule • L to L + 3 months: • Phase 1 of L1b group activities • L1b/L2 data used for L2 algorithms verification at ESRIN • L + 3 to L + 4 months: • Phase 2 of L1b group activities • systematic L2 algorithms verification by ESLs (coarse tuning) • L0, L1b and L2 data disseminated to ESLs and CCVT • L + 4 to L + 6 months: • systematic L2 algorithms verification by ESLs (fine tuning) • L0, L1b and L2 data disseminated to ESLs and CCVT

  3. IPF/F-PAC upgrades time schedule

  4. ESLs/PDS interfaces during CP

  5. ESLs/IPF/F-PAC readiness review • ESLs ready for EnviSat launch: • ref. processors code and DPMs/IODDs updated and checked by ESA • new e-2-e TDS produced to test the new algorithms/interfaces in IPF/F-PAC • frozen state of ref. Processors codes/documentation • IPF upgrade on-going: • new documents/TDS delivered by ESA to ALCATEL • F-PAC software upgrade on-going: • e-2-e TDS available for F-PAC testing • discrepancies between IPF and F-PAC identified

  6. Conclusions • Strategies for L2 algorithms verification already specified • see RA2/MWR Level 2 algorithms verification and products validation plan (PO-PL-ESR-RA-0034 iss. 1.c) for more details • Tools needed for these activities already developed (MSSL) or under development (CLS)