An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Parsons Slough Project, Elkhorn Slough,CA Moving the crane barge into position at the start of the project

  2. Preparation on the RR tie-in at the southern end of the sill

  3. Completion of the RR tie-in at the southern end of the sill

  4. Work on the RR tie-in at the northern end of the sill, including installation of sheet pile with the vibratory hammer

  5. Installation of sheet pile across Parsons channel with the vibratory hammer

  6. Surveying the sill across the channel before dropping the sheets to grade

  7. Installation of the H piles with the impact hammer

  8. Placing the rock ramp

  9. The marine mammal monitoring post on the west side of the sill