An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHC Sector 45 - ∆P=f(t) “Process instabilities” every 2 weeks ! 1 2 3 4 5

  2. Comparison of various runs Today’s limit, corresponding to 30 mbar - 2.0K for saturation temperature, and 2.1K for magnets! Cool-down IT_L5

  3. LHC sector 23, treated ? 16 Mar au 24 Mar Nice tendency ! Treated ? To be confirmed on longer period …

  4. After Easter • P4/sect45: (≈ 18hrs) stop CC - warm-up filter > 80K - re-cooling Access in US/UX45 to check some settings • P6/P8 being evaluated, as we should try to be able to operate with confidence until next Technical stop… • P18/Sect12 and P2/Sect23: Not an issue (so far)