1 / 19

LCLS Wire Scanners

1. LCLS Wire Scanners. Requirements Design Interfaces Status. Requirements. Performance Requirements 5 µm step in X or Y axis ±10 µm absolute position reproducibility 63,500 µm travel range 50 - 7,500 µm per second velocity range 0.2 - 1.0 nC range of Charge. Requirements.

kminnick
Télécharger la présentation

LCLS Wire Scanners

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1 LCLS Wire Scanners • Requirements • Design • Interfaces • Status

  2. Requirements • Performance Requirements • 5 µm step in X or Y axis • ±10 µm absolute position reproducibility • 63,500 µm travel range • 50 - 7,500 µm per second velocity range • 0.2 - 1.0 nC range of Charge

  3. Requirements

  4. Design - Mechanical Distance Measurement (LVDT or similar) Motor Beam Limit Switches

  5. Design - Electrical

  6. Design - Software

  7. Interfaces • Timing System for Beam Synchronization • Network for EPICS Channel Access • Programmatic Interface based on ChannelAccess to roughly 70 EPICS Records per Scanner • User Interface with EDM and MATLab Clients

  8. Programmer’s Interface Control • <DEVICE>:STARTSCAN bo Start scan using given parameters; value 1 means start, set to 0 to cancel General User-settable Wire Scanner Parameters (Set on every scan) • <DEVICE>:USEUWIRE bo Use U wire on next scan • <DEVICE>:USEXWIRE bo Use X wire on next scan • <DEVICE>:USEYWIRE bo Use Y wire on next scan • <DEVICE>:SCANTOCENTER bo Perform scan from outer to inner position (T or F) • <DEVICE>:SCANPULSES ao Number of beam pulses to intercept on current scan User Configuration Parameters (Occasionally Set) • <DEVICE>:UWIREOUTER longout Outer Parked position for U Wire Acquisition • <DEVICE>:UWIREINNER longout Inner Parked position for U Wire Acquisition • <DEVICE>:XWIREOUTER longout Outer Parked position for X Wire Acquisition • <DEVICE>:XWIREINNER longout Inner Parked position for X Wire Acquisition • <DEVICE>:YWIREOUTER longout Outer Parked position for Y Wire Acquisition • <DEVICE>:YWIREINNER longout Inner Parked position for Y Wire Acquisition Static Wire Scanner Parameters (Installation) • <DEVICE>:HASUWIRE bo Is U Wire Present (T or F) • <DEVICE>:HASXWIRE bo Is X Wire Present (T or F) • <DEVICE>:HASYWIRE bo Is Y Wire Present (T or F) • <DEVICE>:INSTALLANGLE bo The angle at which the wire scanner is oriented Status Display • <DEVICE>:SCANPOSSTART ao Calculated Starting position of Current Scan • <DEVICE>:SCANPOSSTOP ao Calculated Stopping position of Current Scan • <DEVICE>:SCANPROGRESS ao Scan percent complete for display to user • <DEVICE>:SCANTEXT stringout Message indicating current state of scan

  9. User Interface - Calibration

  10. User Interface - Calibration

  11. User Interface - Operations

  12. User Interface - Operations

  13. Deployment

  14. Deployment

  15. Current Status

  16. Current Status

  17. Current Status • Driver for Hytec Motion Controllers is complete and tested • Drivers for Caen ADC, Highland LVDT and Hytec IP Carrier Card are in place and have been tested • EDM screens for calibration are complete and have been successfully tested and used • EDM screens for Control Room use are working; functionality is being added and testing is underway • MATLab software to support other high-level functionality will be complete by end of November • Final Design Review is scheduled for mid November

  18. Current Status • All Injection Wire Scanners have been assembled, calibrated and tested • All Electronic components have been received, ready for rack installation • PMTs have been tested and calibrated • ADCs are currently being tested with PMTs • Need to time the cable delays for each detector, since the ADC uses a common gate for all

  19. Team Members • Mechanical • Tim Montagne, J. Langton • Electrical • James Bong, Tom Porter • Software • Doug Murray, Sergei Chevtsov • Physics • Paul Emma, Patrick Krejcik, Doug McCormick

More Related