1 / 34

SYSPRO 6.0 Issue 10

SYSPRO 6.0 Issue 10. Manufacturing. ENHANCEMENTS. Projects & Contracts BOM & WIP – Information at Warehouse BOM & WIP – Co and By-Products Reserving Lots & Serials MRP – Requisition Users Operation Number Increment Job Cost Recalculation. Projects and Contracts. Purpose

kolina
Télécharger la présentation

SYSPRO 6.0 Issue 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SYSPRO 6.0 Issue 10 Manufacturing

  2. ENHANCEMENTS • Projects & Contracts • BOM & WIP – Information at Warehouse • BOM & WIP – Co and By-Products • Reserving Lots & Serials • MRP – Requisition Users • Operation Number Increment • Job Cost Recalculation

  3. Projects and Contracts • Purpose • Improve use and effectiveness of Projects/Contracts • Accurately manage, record and track all payments related to a Project/Contract • Solution • New fields on Contracts • Hierarchy Code; Customer; “Deposit” product class; Billing Method • Provide a Purge contracts function in WIP purge

  4. Projects and Contracts • Progress billings • Define Billing frequency and terms • Quote Confirmed; Contract Created, Job Maintenance • Billing frequency (Day of month, %, value complete) • Flexible billing options (% or value) • Payment schedule • Deposits • Captured and applied on • Contract creation and Quote confirmation • Reduced partially or in full with first, last or any progress payment • Retentions • Fixed value or percentage • Period/Terms • Final invoice reduced by value of retention • Retention invoice raised after pre-defined number of days

  5. Creating a Contract

  6. Billing Schedule Review

  7. Billing Schedule Review

  8. Posting Threshold

  9. Projects and Contracts • Summary • Accurate tracking of costs and revenue • Monitoring of progress billings • Auto-generation of invoices • Management of deposits and retentions • Better control and management of projects

  10. BOM & WIP – Information at WH • Purpose • To improve multi-site manufacturing by allowing for different manufactured costs and lead times per manufacturing location • To allow for Ordering Policy per location

  11. BOM & WIP – Information at WH • Solution • Ordering Policy defined per warehouse • BOM costs and lead times per warehouse • Warehouse defined against component

  12. BOM & WIP - Co- and By-products • Purpose • To improve the planning and processing associated with manufacturing multiple items in a single process

  13. APICS Definitions: • By-Products • A material of value produced as residual or of incidental to the production of the primary item • May be recycled, sold as-is, or used for other purposes • Should never be planned for

  14. APICS Definitions: • Co-Products • Two or more products that are usually manufactured together or sequentially because of product and/or process similarities • Should be planned for

  15. A(1) B(1) C(2) Co-Products and By-Products

  16. Solution: By-Products • Similar to negative allocations, except….. • New part type by-product • Option on BOM to rollup cost to parent or not • By-product allocations shown as supply • By-products excluded from negative processing allocation • Kit Issues, Labor Posting and Job Receipts check for by-products and receive into inventory

  17. Solution: Co-Products • New part types co-product andnotional • A notional item cannot be bought or sold • No inventory transactions • Co-products items attached to notional part • 3 types of co-products • Sequential • Concurrent • Multi-grade • Two costing methods • Simple • Detailed

  18. Simple Costing Define percentage of labor and material to be taken from notional part and applied to co-products (like a proportional bill)

  19. Detailed Costing Percentage of each material and operation applied to each co-product. Useful where costs are specific to a co-product • For example: • A plastic injection mold makes 4 co-products: • CLEAR WHITE RED BLACK

  20. Co-Products and By-Products • Summary • Accurate apportionment of material, labor, etc. • Improved visibility • Facilitates planning

  21. Reserving Lots and Serials • Purpose • Reserve specific Lot/Serial numbers for made-in items • Hard allocate Lots/serials components to a job • Provide full traceability of what component Lot/Serials are used to manufacture a finished Lot/Serial

  22. Reserving Lots and Serials • Solution • Decide at time of confirming a Job • what Lot/Serial numbers will be used to identify the final product • which Lots/Serials should be used in the manufacturing process • Components reserved till material allocation complete • Parents reserved till job receipt, inspection or job closure complete • Operator Security access

  23. Reserving Lots and Serials

  24. MRP – Requisition Users • Purpose • Allow selected requisitions to be include in MRP calculation • Solution • Define list of Requisition Users who’s requisitions to include

  25. MRP Requisition Users

  26. Operation Number Increment • Purpose • Provide simple method of inserting operations • Solution • Allow for increments greater than 1 between operations

  27. Operation increments

  28. Job Cost recalculation • Purpose • Accurate analysis of manufactured costs to expected • Solution • Store and display revised Material and Labour costs against a job, in addition to Expected

More Related