An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Michelson Interferometer for Global High-resolution Thermospheric Imaging (MIGHTI) InstrumentPreliminary Peer ReviewThermalW. Tolson

  2. Outline • MIGHTI Overview • Thermal Requirements • Level 4 – Direct • Level 5 Derived • Temperature Limits • Design Approach – Overall • Thermal Design • Heat Pipe / Radiator Assembly • TEC to Heat Pipe Interface • Camera Housing • Optical Bench • Interferometer • Aft Optics • Baffle • Camera Electronics • Calibration Lamp • Mechanisms • Thermal Control Hardware • Thermal Model • Geometric Configuration • Giver-Receiver Information Exchange • Assumptions • Thermal Analysis • Results Summary • TEC Dissipation • Transient Results • Trade Studies • Testing • Plan Forward

  3. MIGHTI Overview (1 of 3) ICON • MIGHTI is a key instrument on the NASA Class C Ionospheric CONnection Explorer (ICON) Mission headed by the Space Sciences Laboratory (SSL) at UC Berkeley (Dr. Immel, PI) • MIGHTI is a limb imager with two orthogonal fields of view measuring velocity and direction of the thermospheric wind using the atomic Oxygen red and green lines (630.0 nm & 557.7 nm) and the temperature using the molecular Oxygen atmospheric (A) band (762 nm). • ICON Spacecraft Bus Developed by Orbital • MIGHTI is based off the heritage designs of the SHIMMER instruments successfully flown on STS-112 (2002) And STPsat-1 (2007) 630.0nm 557.7nm 762.0nm MIGHTI Behind (B) MIGHTI Ahead (A)

  4. MIGHTI Overview (2 of 3) • Camera Electronics box with an integral radiator • Calibration Lamp – Light source for calibration optics on both MIGHTIs • Two identical MIGHTI instruments, located at 90°±5° • 575km Circular Low Earth Orbit • TBD Launch Vehicle – Pegasus Class (Mass Limitations) • Accelerated Schedule: • MIGHTI PDR = 4/22/14 • MIGHTI CDR = 11/25/14 (Tentative) • MIGHTI PER = 7/9/15 (Tentative) • MIGHTI Instrument Delivery to U.C. Berkeley for Integration with Other Payloads = 11/23/15

  5. MIGHTI Overview (3 of 3) – Instrument Layout One Shot Door Radiator Baffle Assembly Heat Pipe Stepper Motor Control Calibration Optics Entrance Pupil & Shutter Housing Optical Bench Transfer Optics Enclosure Optics Enclosure Camera/Heat Pipe Interface Instrument Flexures (2) near side (2) far side Camera

  6. Thermal Requirements: Level 4 – Direct (1 of 3)

  7. Thermal Requirements: Level 4 – Direct (2 of 3)

  8. Thermal Requirements: Level 4 – Direct (3 of 3)

  9. Thermal Requirements: Level 5 – Derived (1 of 2)

  10. Thermal Requirements: Level 5 – Derived (2 of 2)

  11. Thermal Requirements: Temperature Limits

  12. Design Approach– Overall • Optical Bench Assembly • Thermally isolate from PIP & Baffle • Software (ICP) controlled active heater control to maintain temperature stability • Radiators sized to maintain active heater control margin (>30%) for all on orbit hot-cold operational conditions (MLI on non-radiating surfaces • Radiator, heater, and temperature sensor locations optimized to minimize spatial temperature gradients • NOTE: Design pending completion of ongoing analysis • Camera CCD • Thermally isolated TEC for CCD active thermal control; camera internal design by SDL • Fin radiator heat pipe assembly to transport and reject TEC dissipation and associated parasitic loads • Electronics • Passive radiator design; radiators sized to protect hot case limits (MLI on non-radiating surfaces) • Thermostat controlled operational heaters to protect cold limits as required • Thermostat controlled heaters to protect survival temperature limits • NOTE: survival / safe-mode analysis pending • Structure • MLI to damp orbital (day-night) temperature excursions

  13. Thermal Design – Heat Pipe / Radiator Assembly • Fin Radiator • (2) 1/16” thick 6061 Al face-sheets • 2.4 PCF Al core • A = 2 x 144 in2 • Z93 white paint; both sides • Thermal isolation at supports (4 places) • Titanium flexure supports (2) • Heat Pipe • Dual bore 0.75” x 0.375” Al extrusion • Working fluid ammonia • he / hc = 1.5 / 2.5 W/in/oC • In plane • Exposed length MLI • Embedded in radiator core • Bonded to radiator face-sheets (2) • 3/8” contact (2 sides) along radiator full length

  14. Thermal Design – TEC to Heat Pipe Interface • Heat pipe clamp assembly • Thermally isolated from bench • Thermal design pending • TEC hot side interface • SDL design • need mCp = 119 J/oC • See power dissipation table in thermal model assumptions section • Heat pipe evaporator flange • Acontact = 1.75” x 2.75” • thermal gap filler h = 2.5 W/in2/oC • Heat pipe clamp / saddle • Mass to damp orbital transient temperature swings • Beryllium • m = 0.073 kg (0.016 lb) • Material optimized to minimize absolute mass while maximizing thermal mass (mCp)

  15. Thermal Design – Camera Housing • Camera Housing • Thermally isolated from bench • <0.05 W/oC; verification/margin pending bench detailed analysis • 560 mW internal electronics dissipation • Housing radiator area Z93 white paint or Ag Teflon tape • Partial radiator area on 2 sides shown • Required radiator area pending analysis • Non-radiator area and cabling MLI • MLI light seal at camera / bench interface • Thermostat controlled operational / survival heaters as required Partial radiator area 2 sides TEC hot side interface

  16. Thermal Design – Optical Bench • Optical Bench • Thermally isolated from PIP • Machined 6061 Aluminum • Internal dissipation negligible • Active heater control • Up to 3 operational circuits • Operational heaters software controlled • Operational heaters maintain 20oC +/- 2oC; transient & spatial • Heaters designed to maintain continuous active control (hot-cold environment range) • Design margin 30% • Survival heaters thermostat controlled • Heater size/location definitions pending ongoing analysis • Z93 white paint structure radiators • Radiator design & analysis ongoing • Non-radiating surfaces MLI • Interior high emissivity • Cover (not shown) • Passive • Diffuse high emissivity interior • MLI on outside surfaces Interferometer Oven Camera Bench

  17. Thermal Design – Interferometer • Interferometer • Thermally isolated from support structure • No internal dissipation • Cover • Thermally coupled to base plate • Active heater control; 3 temperature sensors • 2 high resolution; 1 low resolution • 1 heater circuit (multiple heaters) • Operational heaters maintain 25oC +/- 0.1oC; transient & spatial • Operational heaters designed to maintain continuous active control • Design margin 30% • Heater size/location definitions pending ongoing analysis • Outside surface MLI • Inside surface diffuse / high e • Base Plate • Thermally isolated from bench • Bottom side facing bench Al tape (low e) • Top side facing interferometer diffuse / high e Cover Top Plate Fixed Top Interferometer Contacts Interferometer Base Plate Spring Loaded Bottom Interferometer Contacts Thermal Isolators

  18. Thermal Design – Aft Optics • Aft Optics & Shutter Housing • Thermally coupled to bench • Thermally isolated from baffle • Internal dissipation negligible • Single temperature sensor • Active heater control • 1 circuit (design pending analysis) • Operational heaters software controlled • Operational heaters maintain 20oC +/- 2oC; transient & spatial • Heaters designed to maintain continuous active control (hot-cold environment range) • Design margin 30% • Survival heaters thermostat controlled • Survival heater circuit combined with bench • Heater size/location definitions pending ongoing analysis • Z93 white paint structure radiators • Radiator design & analysis ongoing • Non-radiating surfaces MLI • Interior high emissivity Entrance Pupil & Shutter Housing Stepper Motor Aft Optics Enclosure

  19. Thermal Design – Baffle • Baffle Structure • Thermally isolated from Aft Optics • Thermally isolated from supports • Passive thermal control • High emissivity interior • MLI on outside surfaces

  20. Thermal Design – Camera Electronics • CEB radiator • 12 W internal electronics dissipation • Assumed dissipation at radiator • Z93 white paint on front and fin back • CEB housing • Thermally isolated from PIP • Model assumes no conduction to PIP (conservative) • PIP temperature range -20oC to +40oC per SSL/Berkley • Interface conductance requirement TBD by SDL & SSL/Berkley • Housing and cabling MLI • Thermostat controlled survival heaters as required

  21. Thermal Design – Calibration Lamp • Lamp Housing • 8 W internal electronics dissipation • Assumed dissipation uniform over housing • Ag Teflon tape on housing • Thermally isolated from PIP • <0.05 W/oC • cabling MLI • Thermostat controlled survival heaters as required

  22. Design Approach – Mechanisms • Aperture Door • Thermal design & analysis pending • Deployment heater as required • Stepper Motors • Thermal analysis pending • Aft optics motor MLI • Bench Motor radiates to OB cavity • Conduction at mounting interface • Low power duty cycle Baffle Door Baffle Door Door Pin Puller Optical Bench Aft Optics Stepper Motors

  23. Thermal Control Hardware • Thermistors • Manufacturer: Measurement Specialties • Part # 311P18-06A101 • 5K Ohm resistance @ 25oC • RTD’s • Manufacturer: Goodrich Corp. • Part # 0118MF-2000-A • 2K Ohm resistance • Heaters • Manufacturer: Tayco • Type: TPC-6002 Flexible Kapton • Thermostats • Manufacturer: Honeywell • Type: 701 series bi-metallic/mechanical • MLI • 1 outer Layer: 2.75 mil Germanium Black Kapton (GBK) • 13 middle layers: 0.25 mil Aluminized Mylar (VDA2) • 14 separators: B4A Dacron mesh • 1 inner layer: 2 mil Kapton (VDA1) • Material Vendors: Sheldahl; Dunmore

  24. Thermal Control Hardware • Temperature Sensor Specifications • Heater Specifications

  25. Thermal Model: Geometric Configuration • Instrument Suite & Payload Interface Platform (PIP) MIGHTI-B Payload Interface Platform (PIP) MIGHTI-A Camera Electronics Box (CEB) Calibration Lamp

  26. Thermal Model: Geometric Configuration • MIGHTI Instrument Assembly TEC Radiator Baffle Aft Optics Radiator Supports (1 of 2) Camera Conductor-Heat Pipe to Radiator Optical Bench OB Cover

  27. Thermal Model: Geometric Configuration • Camera Electronics Box (CEB) & Calibration Lamp CEB Radiator Calibration Lamp Housing CEB Housing

  28. Thermal Model: Giver-Receiver Information Exchange • Thermal Model Format • Autocad 2014; Thermal Desktop/ SindaFluint -Version 5.6 • ATK to SSL • Reduced MIGHTI instrument Assembly • MIGHTI-A; MIGHTI-B; Camera Electronics Box (CEB); Calibration Lamp • Include geometry; optical properties; thermal masses; conduction network; transient dissipations • SSL to ATK • Reduced PIP & Instrument Suite (geometry & optical properties only) • ATK to SDL • Preliminary CEB radiator size • CEB environmental and IR backload heat loads (transient) • SDL to ATK • CEB mechanical configuration & internal power dissipation • TEC hot side temperature vs. power profile

  29. Thermal Model: Assumptions • Altitude • Circular 576 km (nominal) • Evaluation of altitude range 450 km to 665 km pending • Vehicle Attitude • Operational: +Z Nadir / +X velocity vector • Beta angle versus Time of Year • Orbits • Beta = 50o • Beta = 0o • Beta = -50o

  30. Thermal Model: Assumptions • Optical Properties • Environments

  31. Thermal Model: Assumptions • Component Power Dissipations • TEC Power Dissipation

  32. Thermal Model: Assumptions • Component Masses (as modeled) • Cal Lamp – 1.5 kg • Baffle – 1.84 kg • Camera Electronics – 2.65 kg • TEC Hot Side – 0.159 kg • Material Properties

  33. Thermal Model: Assumptions • Mechanical • Multi-Layer Insulation (MLI) Effective Emittance • Larger blankets: e* = 0.01 to 0.03 • Smaller blankets: e* = 0.03 to 0.10

  34. Thermal Analysis: Results Summary • Operational Hot Case

  35. Thermal Analysis: Results Summary • Operational Cold Case

  36. Thermal Analysis: TEC Dissipation • TEC Hot Case Orbit Average Dissipation • TEC hot side parasitic heat load not included

  37. Thermal Model: Analysis Transient Results – TEC Hot Side • Hot – Beta -50° - MIGHTI A/B • Cold – Beta 0° - MIGHTI A Cold – Beta +50° - MIGHTI B

  38. Thermal Model: Analysis Transient Results – Radiators • Hot – Beta -50° - MIGHTI-A Hot – Beta -50° - MIGHTI-B • Cold – Beta 0° - MIGHTI-A Cold – Beta +50° - MIGHTI-B

  39. Thermal Model: Analysis Transient Results - Baffles • Hot – Beta +50° - MIGHTI-A Hot – Beta +50° - MIGHTI-B • Cold – Beta -50° - MIGHTI-A Cold – Beta -50° - MIGHTI-B

  40. Thermal Model: Analysis Transient Results – Electronics • Hot – Beta -50° - Camera Electronics & Calibration Lamp • Cold – Beta +50° - Camera Electronics & Calibration Lamp

  41. Trade Studies: Thermal Strap vs. Heat Pipe (1 of 2) • Heat Pipe • Thermal Strap

  42. Trade Studies: Thermal Strap vs. Heat Pipe (2 of 2) • Summary of Results • Conclusion • Thermal strap not a viable option • 3 lbm solid K-Core section does not meet requirements for high beta angle conditions • Likely mass required >6 lbm to meet requirements (11 lbm for heat pipe equivalent performance) • Heat pipes meet requirements for worst case on orbit conditions • 2-3 lbm within practical application • Orbit average TEC dissipation reduced relative to strap • Heat pipe cost comparable to strap: ROM approximately $30-50K • Testing considerations/restrictions can be accommodated

  43. Testing (1 of 2) • Standards per GEVS GSFC-STD-7000A • Thermal vacuum qualification standards to ensure that the payload operates satisfactorily in a simulated space environment at more severe conditions than expected during the mission. • Component / Unit Level • Typically done by vendor • Applicable to components with power dissipation: camera, CEB, calibration lamp, motors, actuators • 1 survival cycle • Minimum of 8 thermal vacuum operational temperature cycles • Minimum of 4 hours at each extreme of each temperature cycle • Subsystem / Instrument Level • 1 survival cycle • Minimum of 4 operational thermal vacuum temperature cycles • Minimum of 12 hours at each extreme of each temperature cycle • Thermal balance: survival, hot operational, cold operational • Payload/Spacecraft Level • 1 survival cycle • 4 thermal vacuum operational temperature cycles (2 with project approval; dwell times doubled) • Minimum 24 hours at each extreme of each temperature cycle • Thermal balance as practical

  44. Testing (2 of 2) • Functional testing • At each operational temperature plateau • Turn on test following recovery from survival plateau (usually combined with functional test) • Test Margins • See notes associated with temperature limits table • Considerations/limitations • Likely auxiliary GSE required for radiator temperature control; instrument & payload/SC level • GN2 / heater controlled panels • Heat pipes must be oriented to perform in “reflux” mode • Evaporator (TEC) must be lower than condenser (radiator) relative to gravity • No limitation for +Z axis vertical • For +Z axis horizontal vehicle must be clocked about Z axis to maintain reflux; approximately 90o rotation window

  45. Plan Forward to PDR • Optical Bench Assembly • Includes bench, cover, aft optics, interferometer (no optical components except IF) • Complete high fidelity thermal models • Incorporate interface conductance effects per previous chart • Optimize radiator sizes, locations (NA for interferometer) • Define operational heater layout • Heat Pipe Radiator Assembly • Complete feasibility evaluation incorporating a short thermal strap at TEC/pipe interface • Effort to gain additional mechanical compliance to mitigate camera alignment/distortion issue • Camera • Complete housing radiator design • Determine if housing needs to be thermally coupled to optical bench • Camera Electronics • Good shape for PDR • Calibration Lamp • Refine housing radiator size/location • Other • Clarify all temperature limits • Survival / safe-mode analysis to determine heater requirements • Update PIP geometry to include star tracker radiator blockage effects (likely negligible)