An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD STATUS Outline: • Cosmics: the statistics so far. • News on PRS/SPD VFE Cooling system. • Time Alignment of PRS/SPD. • PRS/SPD Trigger Path achievements. • PRS/SPD HV System • Plans. PS/SPD COMMISSIONING

  2. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD STATUS COSMICS: • We recorded so far 1.2 Million cosmics events with a somehow homogeneous purity (15 Hz) but different XCAL and SPD timing conditions. XCAL moved by 6 ns, then go back to the original value but tuned for upstream tracks. Each time, the TAE analysis saw the changes [fortunately] • These events (inclusively) are currently being analysed to produce a first intercalibration of the channels within a tube (might be possible even in the inner region). To be reported on the end of August meeting. • PRS pedestals are stable. PS/SPD COMMISSIONING

  3. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD STATUS COSMICS: TYPICAL STATISTICS FOR 400k: LEFT:OUTER RIGHT: MIDDLE PS/SPD COMMISSIONING

  4. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD STATUS VFE COOLING SYSTEM: Paolo Guglielmini observed that the water flow was less than after the maintenance. He changed our filters and he measured an increased general flow. According to him, mostly beneficial to us. Not obvious on the plots. 25/07 14/08 15/08 PS/SPD COMMISSIONING

  5. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD TIME ALIGNMENT STATUS Time Alignment ALREADY reported in previous meetings . We start to have sensible data for inner part. PS/SPD COMMISSIONING

  6. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD TIME ALIGNMENT STATUS Time Alignment ALREADY reported in previous meetings . We start to have sensible data for inner part. We understood. Bad of measurement of the fibre bundle: 70 cm PS/SPD COMMISSIONING

  7. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD TRIGGER PATH • Tremendous progresses. • All the internal parameters are now set inot recipes. • Managed to get an electron or a photon trigger (at the Hz) • Yet, many problems found. Some fixed. Some not. The most worrying is related to half-boards. Under scrutiny. • On the usefulness of noise events: the VFE events were/are used to debug the system. • SPD theroretical phaser values are in teh electronics. The alignement is under study. PS/SPD COMMISSIONING

  8. COMMISSIONING MEETING – AUGUST 2008 - W3 PRS/SPD HV SYSTEM • PRS/SPD has an ECAL-like design. • The +/-6 V is better stabilized. Yet, it’s worth measuring the (un)-stability. • A scope is currently installed on 2 channels to get long term (few hours) stability. • LED measurements are foreseen. But not sure we should expect much from there. PS/SPD COMMISSIONING

  9. COMMISSIONING MEETING – AUGUST 2008 - W3 PLANS • PVSS Seq BXIDreset register is defined in the hardware. Recipes and writings on the way. Once tehre, align BCID in FEB/Tell1. • Move the VFE reset in an acceptable range. • Offline: • Inter-calibrate HV. • Inter-calibrate channels within a tube. • LED data PS/SPD COMMISSIONING