1 / 11

The Catalina Sky Survey: NEO Follow-up

The Catalina Sky Survey: NEO Follow-up. Eric J. Christensen + CSS Team LSST All Hands Meeting : 14 August 2012. CSS Overview. Funded by NASA’s NEOO program 100% dedicated to NEO survey + follow-up Assets : 3 survey telescopes + 1 follow up telescope

lark
Télécharger la présentation

The Catalina Sky Survey: NEO Follow-up

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Catalina Sky Survey:NEO Follow-up Eric J. Christensen + CSS Team LSST All Hands Meeting : 14 August 2012

  2. CSS Overview • Funded by NASA’s NEOO program • 100% dedicated to NEO survey + follow-up • Assets: 3 survey telescopes + 1 follow up telescope • Cadence: 4 x 30 s images, deltaT ~10 min. • Filters: none • NEO candidates are pipeline-generated, human-validated in near-real time

  3. IAU Minor Planet Center • Accepts and publishes astrometry of minor planets (“broker”, “subscriber” + “publisher”) • Calculates and publishes orbits of minor planets and comets • Provides tools and services for observers (NEOCP + Blog, MPCES, MPChecker)

  4. Lifecycle of a NEO discovery • Initial detection of NEO candidate • Astrometry reported to Minor Planet Center TP49ECD C2012 08 07.69817 23 41 59.33 -32 55 39.4 18.4 V E12 TP49ECD C2012 08 07.70977 23 41 51.87 -32 55 28.4 18.2 V E12 TP49ECD C2012 08 07.72124 23 41 44.46 -32 55 17.4 18.1 V E12 TP49ECD C2012 08 07.73264 23 41 37.17 -32 55 06.1 18.1 V E12 • Public posting on NEO Confirmation Page • Follow-up: confirmation and orbit refinement • Designation+ publication (MPECs) • Additional follow-up for orbit refinement

  5. Stages of Follow-up • Astrometric follow-up is useful at different times • Same-night: reality check + orbit refinement • Subsequent night(s): leading to “discovery” • Post-discovery: • Same + subsequent apparitions (recovery) • Refines orbit, prevents NEOs from becoming lost

  6. CSS Follow-up : now • Same-night follow-up often conducted on survey telescope(s) • NEO candidates posted <15 min after reporting • Bright objects (< V~20) usually followed by other observing stations, often amateurs • Faint object follow-up conducted on our 1.5-m, or by others on 1 - 2-m class telescopes

  7. CSS Follow-up : soon • 1-m telescope under commissioning • 30 arcmin circular FOV, BVRI filters • Robotically operated, queue scheduled – programmed during day by human • Will accept, prioritize, and execute requests, return data to requestor

  8. CSS Follow-up : soon • Initial stages of collaboration with Las Cumbres Observatory Global Telescope Network • Geographic distribution of LCOGT is ideal for on-call NEO follow-up • Access to near-Sun regions 3-4x per day • 24-hour monitoring of incoming impactors

  9. We are investing in follow-up infrastructure in anticipation of increased discovery rate • Larger cameras for survey telescopes: 1 funded, 1 proposed

  10. We are investing in follow-up infrastructure in anticipation of increased discovery rate • Larger cameras for survey telescopes: 1 funded, 1 proposed 0.7-m Schmidt FOV: 19.4 sq. deg. 1.5” pixels * Proposed * 0.7-m Schmidt FOV: 8.1 sq. deg. 2.5” pixels Current 1.5-m FOV: 5.0 sq. deg. 0.77” pixels * Funded * 1.5-m FOV 1.2 deg 1.0” pixels Current

  11. Questions?

More Related