PM work plan under the Convention on Long-range Transboundary Air Pollution

PM work plan under the Convention on Long-range Transboundary Air Pollution. Henning Wuester Secretariat of the United Nations Economic Commission for Europe http://www.unece.org/env/lrtap (for general information) http://www.unece.org/env/tfiam (for the Task Force).

latika
Télécharger la présentation

PM work plan under the Convention on Long-range Transboundary Air Pollution

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PM work plan under the Convention on Long-range Transboundary Air Pollution Henning Wuester Secretariat of the United Nations Economic Commission for Europe http://www.unece.org/env/lrtap (for general information) http://www.unece.org/env/tfiam (for the Task Force)

  2. Intergovernmental bodies, expert groups and scientific centres under the Convention

  3. Tentative timetable for work on PM, adopted by EMEP: The basis • Broad timing: • Aimed at supporting the review of the Gothenburg Protocol in 2004. • 2003 reserved for testing and sensitivity analysis • Results of specialized studies and new data should be available by 2002 • 2001 for preparatory work • Coverage: acidification, eutrophication, ozone and exposure to fine particles involving SO2, NOx, VOCs, NH3 and the various species of particulate matter. Linkages to climate change policies. Here: only PM-relevant parts

  4. Tentative PM timetable: contributors • EMEP (CCC, MSC-W, CIAM, TFIAM, TFMM, TFEIP) covers: • atmospheric modelling, • monitoring, • emissions & projections, • abatement costs, • integrated assessment modelling • Input from: • other bodies under the Convention (effects) and • work done by EEA and the EC • national contributions by Parties

  5. Tentative PM timetable: Atmospheric modelling

  6. Tentative PM timetable: Monitoring

  7. Tentative PM timetable: Emissions and projections

  8. Tentative PM timetable: Abatement options and costs

  9. Tentative PM timetable: Effects

  10. Tentative PM timetable: Integrated assessment modelling (1)

  11. Tentative PM timetable: Integrated assessment modelling (2)

  12. Tentative PM timetable: summary

  13. Tentative PM timetable: summary