Final Checklist for PCB Fabrication and Assembly Preparation

This detailed checklist outlines the necessary steps to complete before sending the PCB out for fabrication. Remaining components must be positioned correctly, and 200 connections need hand routing alongside 5200 power connections sorted by split planes. It's essential to check for design rule violations, sort reference designators, and ensure solder resist and copper areas are compliant. Once the Gerber, drill, assembly data, and ordering lists are generated, a thorough design review by a designated staff member is required for final approval.

laurel
Télécharger la présentation

Final Checklist for PCB Fabrication and Assembly Preparation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detailed list of what what still needs to be done to board before it is sent out for fabrication 1. Move remaining components into correct positions (18 components). 2. Hand Route 200 remaining connections (including diff pairs). 3. Route 5200 power connections - sort out split planes. 4. Check and remove any offending DRC's. 5. Sort out Reference designators on top and bottom silks for 6500 components. 6. Ensure solder resist is okay for all components, copper areas etc. 7. Generate gerber data. 8. Generate Drill data and drawing. 9. Generate Assembly data (this can be done after boards have been sent out for M/fr). 10. Generate Ordering lists. 11. Design to be checked by D.O. member of staff following D.O.design rule check. 12. Design to be checked and approved in a design review before board goes out.

  2. SCSI cables - on hold, pending new length ? NIM-LVDS module - PCB assembled - awaiting quote QDR - MOQ 480, we require 22, extra cost £21k